Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
153
matching recommendationsSIC | 336 | Nonferrous Foundries (castings) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0024 # 09 Y:2001 | 09 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,134 | $945 | Implemented |
IC0024 # 04 Y:2001 | 04 | 2001 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,943 | $4,000 | Implemented |
IC0024 # 01 Y:2001 | 01 | 2001 | RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION | $27,240 | $6,825 | Not Implemented |
IC0024 # 06 Y:2001 | 06 | 2001 | UPGRADE OBSOLETE EQUIPMENT | $9,500 | $16,800 | Not Implemented |
IC0024 # 03 Y:2001 | 03 | 2001 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $7,403 | $2,000 | Implemented |
IC0024 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,642 | $32,917 | Not Implemented |
IC0024 # 02 Y:2001 | 02 | 2001 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $11,240 | $3,280 | Not Implemented |
IC0024 # 08 Y:2001 | 08 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,811 | $7,956 | Not Implemented |
IC0024 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,634 | $4,300 | Implemented |
IC0024 # 14 Y:2001 | 14 | 2001 | MOVE PRODUCT USING MECHANICAL MEANS | $11,000 | $7,000 | Not Implemented |
IC0024 # 13 Y:2001 | 13 | 2001 | CLEAR AND RENT EXISTING SPACE | $365,820 | $3,920 | Implemented |
IC0024 # 12 Y:2001 | 12 | 2001 | RECYCLE CASTING SAND | $765,000 | $0 | Not Implemented |
IC0024 # 10 Y:2001 | 10 | 2001 | INSTALL SET-BACK TIMERS | $4,823 | $968 | Not Implemented |
IC0024 # 11 Y:2001 | 11 | 2001 | INSTALL SET-BACK TIMERS | $2,245 | $1,741 | Implemented |
IA0284 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $613 | $159 | Implemented |
IA0284 # 04 Y:2001 | 04 | 2001 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $4,016 | $800 | Implemented |
IA0284 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,819 | $182 | Implemented |
IA0284 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $394 | $18 | Implemented |
IA0284 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $216 | $213 | Implemented |
IA0284 # 07 Y:2001 | 07 | 2001 | INSTALL OCCUPANCY SENSORS | $99 | $222 | Not Implemented |
IA0284 # 08 Y:2001 | 08 | 2001 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $19,346 | $43,176 | Not Implemented |
IA0284 # 06 Y:2001 | 06 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $256 | $633 | Not Implemented |
IA0281 # 04 Y:2001 | 04 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,217 | $1,280 | Not Implemented |
IA0281 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,253 | $1,301 | Implemented |
IA0281 # 06 Y:2001 | 06 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,547 | $27 | Not Implemented |