Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
SIC 336 Nonferrous Foundries (castings)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0413 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,295 $20 Implemented
IA0413 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,287 $500 Implemented
IA0413 # 12 Y:2007 12 2007 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $31,051 $4,000 Implemented
IA0413 # 11 Y:2007 11 2007 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $677 $80 Implemented
IA0413 # 10 Y:2007 10 2007 COVER OPEN TANKS $3,772 $1,500 Not Implemented
IA0413 # 09 Y:2007 09 2007 RECOVER WASTE HEAT FROM EQUIPMENT $1,640 $2,160 Not Implemented
IA0413 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,195 $2,135 Implemented
IA0413 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $350 $390 Not Implemented
IA0413 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $620 $535 Implemented
IA0413 # 05 Y:2007 05 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,793 $104 Implemented
IA0413 # 04 Y:2007 04 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,311 $360 Implemented
IA0413 # 03 Y:2007 03 2007 RECOVER WASTE HEAT FROM EQUIPMENT $9,370 $1,650 Not Implemented
IA0412 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,034 $500 Implemented
IA0412 # 08 Y:2007 08 2007 IMPROVE COMBUSTION CONTROL CAPABILITY $6,996 $500 Not Implemented
IA0412 # 07 Y:2007 07 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,880 $104 Implemented
IA0412 # 04 Y:2007 04 2007 COVER OPEN TANKS $143,500 $22,000 Implemented
IA0412 # 03 Y:2007 03 2007 INSTALL OCCUPANCY SENSORS $671 $1,925 Not Implemented
IA0412 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,305 $2,775 Implemented
IA0412 # 09 Y:2007 09 2007 REDUCE SCRAP PRODUCTION $33,433 $4,000 Not Implemented
IA0412 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,810 $1,864 Implemented
IA0412 # 05 Y:2007 05 2007 INSULATE BARE EQUIPMENT $164 $200 Implemented
MZ0007 # 04 Y:2007 04 2007 DISCONNECT BALLASTS $27,567 $1,310 Implemented
MZ0007 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $5,535 $3,250 Implemented
MZ0007 # 03 Y:2007 03 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $533 $0 Implemented
MZ0007 # 02 Y:2007 02 2007 PREHEAT COMBUSTION AIR WITH WASTE HEAT $10,000 $20,000 Not Implemented