IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 336 Nonferrous Foundries (castings)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0159 # 09 Y:2009 09 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $780 $5,456 Not Implemented
IC0159 # 08 Y:2009 08 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $322 $575 Not Implemented
IC0159 # 07 Y:2009 07 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $157 $0 Not Implemented
IC0159 # 06 Y:2009 06 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,212 $5,316 Not Implemented
IC0159 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,906 $0 Not Implemented
IC0159 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $171 $238 Not Implemented
IC0159 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $1,629 $1,927 Not Implemented
IC0159 # 12 Y:2009 12 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $166 $0 Not Implemented
IC0159 # 11 Y:2009 11 2009 REPAIR AND ELIMINATE STEAM LEAKS $2,694 $57 Not Implemented
IC0159 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $443 $162 Not Implemented
IC0159 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,803 $27,853 Not Implemented
IC0159 # 10 Y:2009 10 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $14,132 $5,776 Not Implemented
MZ0037 # 02 Y:2009 02 2009 USE OPTIMUM THICKNESS INSULATION $1,717 $4,200 Not Implemented
MZ0037 # 07 Y:2009 07 2009 INSTALL OCCUPANCY SENSORS $490 $640 Not Implemented
MZ0037 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,988 $59,705 Not Implemented
MZ0037 # 05 Y:2009 05 2009 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $710 $1,993 Not Implemented
MZ0037 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $739 $850 Not Implemented
MZ0037 # 03 Y:2009 03 2009 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $11,665 $2,900 Not Implemented
MZ0037 # 01 Y:2009 01 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $87,552 $18,000 Not Implemented
MA0647 # 01 Y:2009 01 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,325 $30,000 Not Implemented
MA0647 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,543 $1,200 Implemented
MA0647 # 03 Y:2009 03 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $458 $0 Not Implemented
MA0647 # 04 Y:2009 04 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $372 $400 Not Implemented
SD0412 # 05 Y:2009 05 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,333 $0 Implemented
SD0412 # 04 Y:2009 04 2009 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $13,730 $70,000 Not Implemented