IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

99

matching recommendations
Reset
SIC 3363 Aluminum Die-castings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0427 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,899 $10 Not Implemented
BD0427 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,216 $900 Not Implemented
BD0427 # 07 Y:2013 07 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $787 $1,160 Not Implemented
BD0427 # 03 Y:2013 03 2013 USE SYNTHETIC LUBRICANT $1,748 $750 Implemented
BD0427 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,233 $2,210 Implemented
BD0427 # 08 Y:2013 08 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,296 $38,000 Not Implemented
BD0427 # 04 Y:2013 04 2013 DIRECT WARMEST AIR TO COMBUSTION INTAKE $4,369 $4,000 Not Implemented
BD0427 # 06 Y:2013 06 2013 USE RADIANT HEATER FOR SPOT HEATING $5,309 $5,700 Not Implemented
BD0420 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,061 $500 Not Implemented
BD0420 # 01 Y:2012 01 2012 DIRECT WARMEST AIR TO COMBUSTION INTAKE $5,714 $4,000 Not Implemented
BD0420 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $130 $275 Not Implemented
BD0420 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $857 $2,925 Not Implemented
BD0420 # 02 Y:2012 02 2012 USE RADIANT HEATER FOR SPOT HEATING $2,245 $3,000 Not Implemented
BD0420 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $756 $2,100 Not Implemented
BD0420 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $608 $3,000 Not Implemented
BD0420 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $746 $20 Not Implemented
IC0046 # 01 Y:2002 01 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $720 $1,900 Implemented
IC0046 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $30,483 $53,653 Not Implemented
IC0046 # 06 Y:2002 06 2002 REDUCE OR ELIMINATE WASTE $36,204 $27,704 Implemented
IC0046 # 05 Y:2002 05 2002 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,140 $0 Implemented
IC0046 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $6,403 $11,922 Not Implemented
IC0046 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $3,889 $0 Not Implemented
IC0046 # 07 Y:2002 07 2002 AUTOMATE PAYROLL SYSTEM $58,887 $6,196 Implemented
IC0046 # 08 Y:2002 08 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $2,460 $1,600 Implemented
BD0178 # 08 Y:2001 08 2001 USE EVAPORATION TO CONCENTRATE MATERIAL $20,240 $3,600 Implemented