IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,106

matching recommendations
Reset
SIC 3363 Aluminum Die-castings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0164 # 13 Y:2000 13 2000 INCREASE USE OF AUTOMATION $68,990 $152,000 Implemented
BD0164 # 14 Y:2000 14 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $14,730 $24,000 Not Implemented
BD0164 # 15 Y:2000 15 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $7,800 $2,000 Not Implemented
BD0164 # 16 Y:2000 16 2000 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $780 $100 Implemented
BD0164 # 17 Y:2000 17 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $360 $100 Not Implemented
WV0190 # 01 Y:2000 01 2000 IMPROVE COMBUSTION CONTROL CAPABILITY $204,769 $34,000 Implemented
WV0190 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,748 $9,600 Not Implemented
WV0190 # 03 Y:2000 03 2000 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $24,565 $9,120 Not Implemented
WV0190 # 04 Y:2000 04 2000 COVER OPEN TANKS $11,730 $5,760 Implemented
WV0190 # 05 Y:2000 05 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $920 $850 Not Implemented
WV0190 # 06 Y:2000 06 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,883 $780 Implemented
WV0190 # 07 Y:2000 07 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $63,174 $66,000 Implemented
WV0190 # 08 Y:2000 08 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $2,768 $2,868 Not Implemented
WV0190 # 09 Y:2000 09 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,514 $30 Not Implemented
WV0190 # 10 Y:2000 10 2000 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $52,195 $13,550 Not Implemented
WV0190 # 11 Y:2000 11 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $66,820 $78,000 Implemented
WV0190 # 12 Y:2000 12 2000 INSTALL SENSORS TO DETECT DEFECTS $1,785,600 $2,400,000 Not Implemented
WV0190 # 13 Y:2000 13 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $15,000 $6,240 Not Implemented
UM0159 # 01 Y:2000 01 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,800 $200 Implemented
UM0159 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $172 $50 Implemented
UM0159 # 03 Y:2000 03 2000 ADJUST BURNERS FOR EFFICIENT OPERATION $10,836 $3,000 Implemented
UM0159 # 04 Y:2000 04 2000 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $4,390 $4,000 Implemented
UM0159 # 05 Y:2000 05 2000 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $4,800 $8,000 Implemented
UM0159 # 06 Y:2000 06 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $88,447 $27,000 Implemented
UM0159 # 07 Y:2000 07 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $95,726 $35,000 Not Implemented