IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,106

matching recommendations
Reset
SIC 3363 Aluminum Die-castings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0257 # 05 Y:1988 05 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,026 $0 Implemented
OK0264 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $72 $67 Not Implemented
OK0264 # 02 Y:1988 02 1988 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $19,637 $13,608 Implemented
OK0264 # 03 Y:1988 03 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $469 $266 Implemented
OK0264 # 04 Y:1988 04 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $263 $0 Implemented
UD0213 # 01 Y:1987 01 1987 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,229 $20,000 Implemented
UD0213 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,000 $10,000 Implemented
UD0213 # 03 Y:1987 03 1987 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $45,881 $100,000 Not Implemented
UD0213 # 04 Y:1987 04 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,036 $2,000 Implemented
UD0213 # 05 Y:1987 05 1987 RECOVER WASTE HEAT FROM EQUIPMENT $6,181 $15,000 Implemented
UD0214 # 01 Y:1987 01 1987 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,963 $3,000 Not Implemented
UD0214 # 02 Y:1987 02 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,230 $800 Implemented
UD0214 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,924 $910 Implemented
UD0214 # 04 Y:1987 04 1987 COVER OPEN TANKS $1,924 $400 Not Implemented
LT0062 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $60,455 $5,000 Implemented
LT0062 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,530 $500 Implemented
LT0062 # 03 Y:1986 03 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,521 $0 Implemented
LT0062 # 04 Y:1986 04 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $79,027 $80,080 Not Implemented
LT0062 # 05 Y:1986 05 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $20,440 $22,200 Not Implemented
LT0062 # 06 Y:1986 06 1986 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $11,242 $0 Not Implemented
LT0062 # 07 Y:1986 07 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $194 $187 Not Implemented
GT0283 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,498 $44,880 Implemented
GT0283 # 02 Y:1986 02 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $664 $761 Implemented
GT0283 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $76 $64 Implemented
GT0283 # 04 Y:1986 04 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,605 $540 Implemented