IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

61

matching recommendations
Reset
SIC 3363 Aluminum Die-castings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0150 # 07 Y:1999 07 1999 PAY BILLS ON TIME TO AVOID LATE FEES $277 $0 Implemented
DS0150 # 06 Y:1999 06 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $626 $400 Not Implemented
DS0150 # 05 Y:1999 05 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $29,468 $37,220 Implemented
DS0150 # 04 Y:1999 04 1999 REDUCE VENTILATION AIR $32,699 $30,301 Implemented
DS0150 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,552 $15,640 Implemented
DS0150 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $512 $483 Not Implemented
DS0150 # 01 Y:1999 01 1999 USE OPTIMUM THICKNESS INSULATION $6,312 $2,897 Not Implemented
WI0357 # 11 Y:1999 11 1999 INSULATE BARE EQUIPMENT $494 $848 Not Implemented
WI0357 # 02 Y:1999 02 1999 USE EVAPORATION TO CONCENTRATE MATERIAL $39,582 $76,000 Not Implemented
WI0357 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,443 $155,500 Not Implemented
WI0357 # 03 Y:1999 03 1999 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $25,236 $60,000 Not Implemented
WI0357 # 04 Y:1999 04 1999 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $24,655 $10,800 Implemented
WI0357 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,282 $1,580 Not Implemented
WI0357 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $900 $210 Implemented
WI0357 # 07 Y:1999 07 1999 DISTILL CONTAMINATED SOLVENTS FOR REUSE $2,963 $7,000 Not Implemented
WI0357 # 08 Y:1999 08 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,702 $1,000 Not Implemented
WI0357 # 09 Y:1999 09 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,780 $0 Not Implemented
WI0357 # 10 Y:1999 10 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,131 $4,017 Implemented
OR0352 # 01 Y:1999 01 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $60,160 $81,250 Not Implemented
OR0352 # 07 Y:1999 07 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,430 $0 Not Implemented
OR0352 # 06 Y:1999 06 1999 COVER OPEN TANKS $2,130 $5,385 Not Implemented
OR0352 # 04 Y:1999 04 1999 USE OPTIMUM THICKNESS INSULATION $3,970 $950 Not Implemented
OR0352 # 05 Y:1999 05 1999 COVER OPEN TANKS $1,940 $870 Not Implemented
OR0352 # 02 Y:1999 02 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,270 $3,200 Not Implemented
OR0352 # 03 Y:1999 03 1999 OPTIMIZE PLANT POWER FACTOR $9,819 $8,400 Not Implemented