Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
208
matching recommendationsSIC | 3366 | Copper Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0320 # 10 Y:2005 | 10 | 2005 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $975 | $955 | Not Implemented |
WV0320 # 11 Y:2005 | 11 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $728 | $667 | Implemented |
WV0320 # 12 Y:2005 | 12 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $487 | $400 | Not Implemented |
WV0320 # 13 Y:2005 | 13 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $474 | $488 | Not Implemented |
WV0320 # 14 Y:2005 | 14 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $457 | $430 | Implemented |
WV0320 # 15 Y:2005 | 15 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $438 | $80 | Implemented |
WV0320 # 16 Y:2005 | 16 | 2005 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $351 | $26 | Not Implemented |
LE0200 # 01 Y:2004 | 01 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $18,210 | $3,000 | Implemented |
LE0200 # 02 Y:2004 | 02 | 2004 | AIR CONDITION ONLY SPACE NECESSARY | $9,386 | $360 | Not Implemented |
LE0200 # 03 Y:2004 | 03 | 2004 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $3,305 | $800 | Implemented |
LE0200 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,878 | $4,000 | Implemented |
LE0200 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,266 | $750 | Implemented |
LE0200 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,198 | $0 | Implemented |
LE0200 # 07 Y:2004 | 07 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,132 | $400 | Implemented |
LE0200 # 08 Y:2004 | 08 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $904 | $500 | Implemented |
LE0200 # 09 Y:2004 | 09 | 2004 | IMPROVE COMBUSTION CONTROL CAPABILITY | $857 | $200 | Implemented |
LE0200 # 10 Y:2004 | 10 | 2004 | USE OPTIMUM THICKNESS INSULATION | $768 | $300 | Implemented |
LE0200 # 11 Y:2004 | 11 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $657 | $380 | Implemented |
LM0080 # 07 Y:2004 | 07 | 2004 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $869 | $0 | Not Implemented |
LM0080 # 03 Y:2004 | 03 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $537 | $0 | Implemented |
LM0080 # 04 Y:2004 | 04 | 2004 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $28,600 | $20,592 | Not Implemented |
LM0080 # 05 Y:2004 | 05 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $3,467 | $6,000 | Not Implemented |
LM0080 # 06 Y:2004 | 06 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $23,164 | $300 | Implemented |
LM0080 # 02 Y:2004 | 02 | 2004 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $266 | $165 | Not Implemented |
LM0080 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $621 | $475 | Implemented |