Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
208
matching recommendationsSIC | 3366 | Copper Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0024 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,634 | $4,300 | Implemented |
IC0024 # 06 Y:2001 | 06 | 2001 | UPGRADE OBSOLETE EQUIPMENT | $9,500 | $16,800 | Not Implemented |
IC0024 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,642 | $32,917 | Not Implemented |
IC0024 # 08 Y:2001 | 08 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,811 | $7,956 | Not Implemented |
IC0024 # 09 Y:2001 | 09 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,134 | $945 | Implemented |
IC0024 # 10 Y:2001 | 10 | 2001 | INSTALL SET-BACK TIMERS | $4,823 | $968 | Not Implemented |
IC0024 # 11 Y:2001 | 11 | 2001 | INSTALL SET-BACK TIMERS | $2,245 | $1,741 | Implemented |
IC0024 # 12 Y:2001 | 12 | 2001 | RECYCLE CASTING SAND | $765,000 | $0 | Not Implemented |
IC0024 # 13 Y:2001 | 13 | 2001 | CLEAR AND RENT EXISTING SPACE | $365,820 | $3,920 | Implemented |
IC0024 # 14 Y:2001 | 14 | 2001 | MOVE PRODUCT USING MECHANICAL MEANS | $11,000 | $7,000 | Not Implemented |
OD0166 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,013 | $8,525 | n/a |
OD0166 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,297 | $520 | n/a |
OD0166 # 03 Y:2000 | 03 | 2000 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $13,669 | $113,000 | n/a |
OD0166 # 04 Y:2000 | 04 | 2000 | METER WASTE WATER | $20,038 | $6,955 | n/a |
UM0175 # 01 Y:2000 | 01 | 2000 | INSTALL OCCUPANCY SENSORS | $455 | $1,000 | Not Implemented |
UM0175 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,249 | $600 | Implemented |
UM0175 # 03 Y:2000 | 03 | 2000 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $4,332 | $6,000 | Not Implemented |
UM0175 # 04 Y:2000 | 04 | 2000 | INSULATE BARE EQUIPMENT | $1,824 | $2,288 | Not Implemented |
UM0175 # 05 Y:2000 | 05 | 2000 | USE OPTIMUM THICKNESS INSULATION | $3,029 | $1,324 | Not Implemented |
UM0175 # 06 Y:2000 | 06 | 2000 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $9,120 | $7,313 | Not Implemented |
UM0172 # 01 Y:2000 | 01 | 2000 | INSTALL OCCUPANCY SENSORS | $821 | $1,000 | Not Implemented |
UM0172 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,562 | $1,200 | Implemented |
UM0172 # 03 Y:2000 | 03 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,550 | $100 | Not Implemented |
UM0172 # 04 Y:2000 | 04 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $791 | $500 | Implemented |
UM0172 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,330 | $1,000 | Not Implemented |