IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

208

matching recommendations
Reset
SIC 3366 Copper Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0024 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,634 $4,300 Implemented
IC0024 # 06 Y:2001 06 2001 UPGRADE OBSOLETE EQUIPMENT $9,500 $16,800 Not Implemented
IC0024 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,642 $32,917 Not Implemented
IC0024 # 08 Y:2001 08 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,811 $7,956 Not Implemented
IC0024 # 09 Y:2001 09 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,134 $945 Implemented
IC0024 # 10 Y:2001 10 2001 INSTALL SET-BACK TIMERS $4,823 $968 Not Implemented
IC0024 # 11 Y:2001 11 2001 INSTALL SET-BACK TIMERS $2,245 $1,741 Implemented
IC0024 # 12 Y:2001 12 2001 RECYCLE CASTING SAND $765,000 $0 Not Implemented
IC0024 # 13 Y:2001 13 2001 $365,820 $3,920 Implemented
IC0024 # 14 Y:2001 14 2001 $11,000 $7,000 Not Implemented
OD0166 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,013 $8,525 n/a
OD0166 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,297 $520 n/a
OD0166 # 03 Y:2000 03 2000 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $13,669 $113,000 n/a
OD0166 # 04 Y:2000 04 2000 METER WASTE WATER $20,038 $6,955 n/a
UM0175 # 01 Y:2000 01 2000 INSTALL OCCUPANCY SENSORS $455 $1,000 Not Implemented
UM0175 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,249 $600 Implemented
UM0175 # 03 Y:2000 03 2000 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $4,332 $6,000 Not Implemented
UM0175 # 04 Y:2000 04 2000 INSULATE BARE EQUIPMENT $1,824 $2,288 Not Implemented
UM0175 # 05 Y:2000 05 2000 USE OPTIMUM THICKNESS INSULATION $3,029 $1,324 Not Implemented
UM0175 # 06 Y:2000 06 2000 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $9,120 $7,313 Not Implemented
UM0172 # 01 Y:2000 01 2000 INSTALL OCCUPANCY SENSORS $821 $1,000 Not Implemented
UM0172 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,562 $1,200 Implemented
UM0172 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,550 $100 Not Implemented
UM0172 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $791 $500 Implemented
UM0172 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $2,330 $1,000 Not Implemented