IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,058

matching recommendations
Reset
SIC 339 Miscellaneous Primary Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0232 # 12 Y:2000 12 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,400 $1,035 Not Implemented
HO0232 # 13 Y:2000 13 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $840 $25 Not Implemented
HO0232 # 14 Y:2000 14 2000 CLEAR AND RENT EXISTING SPACE $341,986 $1,000 Not Implemented
HO0232 # 15 Y:2000 15 2000 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $7,800 $5,000 Not Implemented
HO0232 # 16 Y:2000 16 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $16,380 $0 Not Implemented
HO0232 # 17 Y:2000 17 2000 INSTALL SHROUDING ON MACHINES TO PREVENT SPLASHING $2,295 $2,000 Not Implemented
HO0232 # 18 Y:2000 18 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,500 $368 Not Implemented
HO0232 # 19 Y:2000 19 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $5,360 $6,240 Not Implemented
HO0232 # 20 Y:2000 20 2000 MAINTAIN MACHINES TO REDUCE LEAKS $2,280 $240 Not Implemented
HO0232 # 21 Y:2000 21 2000 RECOVER AND REUSE WASTE MATERIAL $93,600 $500 Not Implemented
UM0162 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,699 $50 Not Implemented
UM0162 # 02 Y:2000 02 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,362 $10,000 Implemented
UM0162 # 03 Y:2000 03 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,628 $10,800 Implemented
UM0162 # 04 Y:2000 04 2000 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $15,894 $12,000 Implemented
UM0162 # 05 Y:2000 05 2000 INSTALL AUTOMATIC STACK DAMPER $576 $720 Implemented
UM0162 # 06 Y:2000 06 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,858 $36,000 Implemented
UM0162 # 07 Y:2000 07 2000 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $12,510 $24,650 Implemented
MA0463 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $203,441 $1,320,000 Not Implemented
MA0463 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,420 $120,000 Implemented
MA0463 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,123 $12,075 Not Implemented
MA0463 # 04 Y:2000 04 2000 OPTIMIZE PLANT POWER FACTOR $3,291 $9,600 Not Implemented
MA0463 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,745 $4,317 Implemented
MA0463 # 06 Y:2000 06 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $240 $420 Implemented
BD0135 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $39,862 $80,000 Not Implemented
BD0135 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,214 $1,200 Not Implemented