IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,047

matching recommendations
Reset
SIC 339 Miscellaneous Primary Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0007 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,606 $8,840 Implemented
UM0007 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,566 $19,063 Implemented
UM0007 # 03 Y:1994 03 1994 INSTALL OCCUPANCY SENSORS $1,408 $570 Not Implemented
UM0007 # 04 Y:1994 04 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,032 $3,000 Implemented
UM0007 # 05 Y:1994 05 1994 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,179 $3,100 Implemented
UM0007 # 06 Y:1994 06 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,570 $6,179 Not Implemented
UM0008 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,721 $6,410 Implemented
UM0008 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $680 $2,050 Implemented
UM0008 # 03 Y:1994 03 1994 OPTIMIZE PLANT POWER FACTOR $4,653 $6,900 Implemented
UM0008 # 04 Y:1994 04 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $394 $157 Implemented
UM0008 # 05 Y:1994 05 1994 COVER OPEN TANKS $8,446 $4,762 Not Implemented
UM0008 # 06 Y:1994 06 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,283 $7,772 Not Implemented
UM0005 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,350 $7,970 Implemented
UM0005 # 02 Y:1994 02 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $970 $500 Implemented
UM0005 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,410 $9,428 Implemented
UM0005 # 04 Y:1994 04 1994 COVER OPEN TANKS $6,181 $4,762 Not Implemented
UM0005 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $986 $600 Implemented
UM0005 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $561 $200 Implemented
UM0005 # 07 Y:1994 07 1994 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $17,300 $6,600 Implemented
UM0005 # 08 Y:1994 08 1994 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $40,230 $34,000 Implemented
ME0123 # 01 Y:1994 01 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,352 $500 Implemented
ME0123 # 02 Y:1994 02 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,038 $1,500 Implemented
ME0123 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $722 $500 Not Implemented
ME0123 # 04 Y:1994 04 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $816 $750 Not Implemented
ME0123 # 05 Y:1994 05 1994 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $21,216 $52,000 Not Implemented