IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

115

matching recommendations
Reset
SIC 339 Miscellaneous Primary Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0024 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,238 $4,250 Implemented
MU0024 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $247 $260 Not Implemented
MU0024 # 01 Y:2023 01 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,863 $294,000 Implemented
MU0024 # 05 Y:2023 05 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $203 $76 Implemented
MU0024 # 02 Y:2023 02 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $11,030 $122,000 Not Implemented
UMS006 # 01 Y:2012 01 2012 CONVERT TO OXYFUEL BURNERS $710,000 $550,000 Not Implemented
UMS006 # 02 Y:2012 02 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $105,000 $210,000 Not Implemented
UMS006 # 04 Y:2012 04 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $6,500 $5,000 Not Implemented
UMS006 # 03 Y:2012 03 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $28,000 $10,000 Implemented
UMS006 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $4,800 $9,000 Not Implemented
UM0294 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $1,231 $1,344 Not Implemented
UM0294 # 04 Y:2005 04 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,051 $2,400 Not Implemented
UM0294 # 01 Y:2005 01 2005 COVER OPEN TANKS $48,559 $7,232 Not Implemented
UM0294 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,274 $600 Not Implemented
UM0294 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,684 $4,536 Not Implemented
UM0294 # 05 Y:2005 05 2005 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,604 $3,000 Not Implemented
UM0234 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $71,900 $180,000 Implemented
UM0234 # 05 Y:2003 05 2003 COVER OPEN TANKS $8,523 $2,000 Not Implemented
UM0234 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,415 $2,925 Not Implemented
UM0234 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $27,488 $360 Not Implemented
UM0234 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,603 $120,000 Implemented
UM0234 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,198 $5,219 Not Implemented
UM0217 # 06 Y:2002 06 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $300 $50 Not Implemented
UM0217 # 08 Y:2002 08 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $2,050 $1,350 Implemented
UM0217 # 07 Y:2002 07 2002 $2,860 $2,500 Implemented