IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

102

matching recommendations
Reset
SIC 339 Miscellaneous Primary Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0535 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,728 $2,200 Not Implemented
LE0535 # 04 Y:2022 04 2022 UPGRADE OBSOLETE EQUIPMENT $246,141 $750,000 Not Implemented
LE0535 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,826 $6,362 Not Implemented
LE0535 # 02 Y:2022 02 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $684 $780 Not Implemented
LE0535 # 05 Y:2022 05 2022 PREHEAT COMBUSTION AIR WITH WASTE HEAT $44,811 $140,000 Not Implemented
LE0535 # 06 Y:2022 06 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $75,870 $448,000 Not Implemented
SU0454 # 05 Y:2018 05 2018 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $624 $702 Implemented
SU0454 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $631 $1,100 Implemented
SU0454 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,562 $2,313 Implemented
SU0454 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $201 $168 Implemented
SU0454 # 01 Y:2018 01 2018 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,250 $2,600 Implemented
SU0454 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $609 $1,336 Implemented
DL0146 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $730 $100 Implemented
DL0146 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,520 $125,000 Not Implemented
DL0146 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $500 $1,425 Not Implemented
DL0146 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $6,880 $1,000 Implemented
LE0389 # 01 Y:2015 01 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,935 $450 Implemented
LE0389 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,458 $81,373 Implemented
LE0389 # 06 Y:2015 06 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,484 $20,000 Not Implemented
LE0389 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $642 $1,000 Implemented
LE0389 # 03 Y:2015 03 2015 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $21,418 $21,650 Implemented
LE0389 # 02 Y:2015 02 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,547 $4,500 Implemented
LE0310 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,363 $200 Implemented
LE0310 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,927 $30,380 Not Implemented
LE0310 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,531 $10,000 Implemented