Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
154
matching recommendationsSIC | 3398 | Metal Heat Treating |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CI0049 # 02 Y:2025 | 02 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $28,480 | $125,000 | n/a |
CI0049 # 01 Y:2025 | 01 | 2025 | REPLACE BOILER | $31,771 | $18,000 | n/a |
CI0049 # 11 Y:2025 | 11 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $918 | $470 | n/a |
CI0049 # 10 Y:2025 | 10 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,572 | $11,000 | n/a |
CI0049 # 09 Y:2025 | 09 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $9,652 | $40,000 | n/a |
CI0049 # 08 Y:2025 | 08 | 2025 | USE POWER DURING OFF-PEAK PERIODS | $13,567 | $22,000 | n/a |
CI0049 # 07 Y:2025 | 07 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $13,673 | $350,000 | n/a |
CI0049 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,474 | $5,000 | n/a |
CI0049 # 05 Y:2025 | 05 | 2025 | ADJUST BURNERS FOR EFFICIENT OPERATION | $18,240 | $44,000 | n/a |
CI0049 # 04 Y:2025 | 04 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $17,261 | $58,000 | n/a |
CI0049 # 03 Y:2025 | 03 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $18,814 | $22,000 | n/a |
SD0676 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $39,510 | $44,993 | n/a |
SD0676 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $35,908 | $47,771 | n/a |
SD0676 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,618 | $1,911 | n/a |
SD0676 # 10 Y:2025 | 10 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,179 | $8,868 | n/a |
SD0676 # 08 Y:2025 | 08 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $143,491 | $0 | n/a |
SD0676 # 11 Y:2025 | 11 | 2025 | INSTALL COMMON HEADER ON COMPRESSORS | $2,478 | $2,050 | n/a |
SD0676 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $109,396 | $5,254 | n/a |
SD0676 # 09 Y:2025 | 09 | 2025 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $153,587 | $200,000 | n/a |
SD0676 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,684 | $2,699 | n/a |
SD0676 # 05 Y:2025 | 05 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,805 | $0 | n/a |
SD0676 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,821 | $7,047 | n/a |
SJ0035 # 09 Y:2025 | 09 | 2025 | COMBINE UTILITY METERS | $38,439 | $0 | n/a |
SJ0035 # 02 Y:2025 | 02 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,438 | $13,895 | n/a |
SJ0035 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $98,897 | $43,475 | n/a |