IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

587

matching recommendations
Reset
SIC 3398 Metal Heat Treating
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0271 # 07 Y:2001 07 2001 INSTALL SKYLIGHTS $1,180 $5,321 Not Implemented
UF0271 # 08 Y:2001 08 2001 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $5,285 $75 Implemented
UF0271 # 09 Y:2001 09 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,210 $7,000 Not Implemented
UF0271 # 10 Y:2001 10 2001 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM $282 $260 Implemented
UF0271 # 11 Y:2001 11 2001 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $2,958 $6,000 Implemented
UM0181 # 01 Y:2001 01 2001 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $300 $300 Not Implemented
UM0181 # 02 Y:2001 02 2001 USE OPTIMUM THICKNESS INSULATION $3,470 $3,540 Not Implemented
UM0181 # 03 Y:2001 03 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $94,100 $71,000 Not Implemented
UM0181 # 04 Y:2001 04 2001 IMPROVE SPACE COMFORT CONDITIONING $4,520 $8,000 Not Implemented
UM0176 # 01 Y:2000 01 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $733 $500 Not Implemented
UM0176 # 02 Y:2000 02 2000 INCREASE AMOUNT OF CONDENSATE RETURNED $72,582 $15,000 Not Implemented
UM0176 # 03 Y:2000 03 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $2,038 $2,201 Not Implemented
UM0176 # 04 Y:2000 04 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $127,531 $162,750 Not Implemented
UM0176 # 05 Y:2000 05 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $51,717 $8,050 Not Implemented
UM0176 # 06 Y:2000 06 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $425,187 $800,000 Not Implemented
UM0162 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,699 $50 Not Implemented
UM0162 # 02 Y:2000 02 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,362 $10,000 Implemented
UM0162 # 03 Y:2000 03 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,628 $10,800 Implemented
UM0162 # 04 Y:2000 04 2000 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $15,894 $12,000 Implemented
UM0162 # 05 Y:2000 05 2000 INSTALL AUTOMATIC STACK DAMPER $576 $720 Implemented
UM0162 # 06 Y:2000 06 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,858 $36,000 Implemented
UM0162 # 07 Y:2000 07 2000 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $12,510 $24,650 Implemented
MA0463 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $203,441 $1,320,000 Not Implemented
MA0463 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,420 $120,000 Implemented
MA0463 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,123 $12,075 Not Implemented