Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsSIC | 3398 | Metal Heat Treating |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0289 # 10 Y:2004 | 10 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $7,873 | $100 | Not Implemented |
SF0289 # 06 Y:2004 | 06 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $270 | $885 | Implemented |
SF0289 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,525 | $12,060 | Not Implemented |
SF0289 # 04 Y:2004 | 04 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $864 | $1,183 | Not Implemented |
SF0289 # 03 Y:2004 | 03 | 2004 | INSTALL OCCUPANCY SENSORS | $1,280 | $1,280 | Not Implemented |
SF0289 # 02 Y:2004 | 02 | 2004 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $956 | $180 | Implemented |
SF0289 # 01 Y:2004 | 01 | 2004 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,527 | $2,527 | Implemented |
SF0289 # 09 Y:2004 | 09 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $449 | $960 | Not Implemented |
SF0289 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,750 | $6,748 | Implemented |
SF0289 # 07 Y:2004 | 07 | 2004 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,506 | $6,000 | Not Implemented |
LM0074 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,673 | $125 | Implemented |
LM0074 # 05 Y:2004 | 05 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $3,618 | $4,000 | Implemented |
LM0074 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,439 | $1,740 | Implemented |
LM0074 # 07 Y:2004 | 07 | 2004 | INSTALL SKYLIGHTS | $2,237 | $300 | Not Implemented |
LM0074 # 08 Y:2004 | 08 | 2004 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $21,938 | $6,600 | Implemented |
LM0074 # 09 Y:2004 | 09 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $431 | $0 | Not Implemented |
LM0074 # 10 Y:2004 | 10 | 2004 | MODIFY WORKLOAD | $41,860 | $19,000 | Implemented |
LM0074 # 03 Y:2004 | 03 | 2004 | PAY BILLS ON TIME TO AVOID LATE FEES | $392 | $0 | Implemented |
LM0074 # 01 Y:2004 | 01 | 2004 | INSULATE BARE EQUIPMENT | $3,094 | $231 | Implemented |
LM0074 # 02 Y:2004 | 02 | 2004 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $1,288 | $1,000 | Implemented |
SF0279 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,368 | $11,810 | Not Implemented |
SF0279 # 05 Y:2004 | 05 | 2004 | OPTIMIZE PLANT POWER FACTOR | $1,079 | $1,376 | Not Implemented |
SF0279 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,520 | $13,375 | Implemented |
SF0279 # 03 Y:2004 | 03 | 2004 | INSTALL OCCUPANCY SENSORS | $1,168 | $1,200 | Not Implemented |
SF0279 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $699 | $0 | Implemented |