IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 3399 Primary Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0024 # 02 Y:2023 02 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $11,030 $122,000 Not Implemented
MU0024 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,238 $4,250 Implemented
MU0024 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $247 $260 Not Implemented
MU0024 # 05 Y:2023 05 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $203 $76 Implemented
MU0024 # 01 Y:2023 01 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,863 $294,000 Implemented
UM0213 # 07 Y:2002 07 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,355 $1,468 Implemented
UM0213 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,292 $3,000 Implemented
UM0213 # 05 Y:2002 05 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $11,201 $500 Implemented
UM0213 # 04 Y:2002 04 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $22,460 $3,600 Implemented
UM0213 # 03 Y:2002 03 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $23,514 $500 Implemented
UM0213 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,927 $71,714 Implemented
UM0213 # 01 Y:2002 01 2002 RECOVER WASTE HEAT FROM EQUIPMENT $40,905 $1,000 Not Implemented
UM0021 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,209 $1,167 Implemented
UM0021 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,758 $5,594 Not Implemented
UM0021 # 03 Y:1995 03 1995 OPTIMIZE PLANT POWER FACTOR $1,047 $2,160 Not Implemented
UM0021 # 04 Y:1995 04 1995 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $28,057 $1,600 Not Implemented
UM0021 # 05 Y:1995 05 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,180 $8,000 Not Implemented
UM0015 # 03 Y:1994 03 1994 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,498 $16,200 Implemented
UM0015 # 04 Y:1994 04 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,000 $0 Implemented
UM0015 # 05 Y:1994 05 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $413 $350 Not Implemented
UM0015 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,226 $15,513 Implemented
UM0015 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,087 $19,430 Implemented
UM0014 # 05 Y:1994 05 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $624 $189 Implemented
UM0014 # 04 Y:1994 04 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,000 $0 Implemented
UM0014 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $497 $1,000 Not Implemented