Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 3399 | Primary Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0065 # 02 Y:2011 | 02 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,000 | $22,400 | Not Implemented |
DL0065 # 03 Y:2011 | 03 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,460 | $3,680 | Not Implemented |
DL0065 # 04 Y:2011 | 04 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $3,970 | $1,158 | Implemented |
DL0065 # 05 Y:2011 | 05 | 2011 | USE SOLAR HEAT TO MAKE ELECTRICTY | $22,650 | $328,687 | Not Implemented |
DL0065 # 06 Y:2011 | 06 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,834 | $2,409 | Implemented |
DL0065 # 07 Y:2011 | 07 | 2011 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,530 | $3,280 | Not Implemented |
DL0065 # 08 Y:2011 | 08 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $510 | $50 | Implemented |
DL0065 # 01 Y:2011 | 01 | 2011 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $14,500 | $30,600 | Not Implemented |
HO0080 # 01 Y:1994 | 01 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,503 | $1,976 | Implemented |
HO0080 # 02 Y:1994 | 02 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,842 | $4,383 | Implemented |
HO0080 # 03 Y:1994 | 03 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,282 | $2,977 | Implemented |
HO0080 # 04 Y:1994 | 04 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,314 | $1,500 | Implemented |
HO0080 # 05 Y:1994 | 05 | 1994 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $263,543 | $1,260,000 | Not Implemented |
RU0125 # 01 Y:1991 | 01 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $376 | $231 | Implemented |
RU0125 # 04 Y:1991 | 04 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $18,308 | $0 | Implemented |
RU0125 # 03 Y:1991 | 03 | 1991 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,548 | $0 | Implemented |
RU0125 # 02 Y:1991 | 02 | 1991 | INSTALL SET-BACK TIMERS | $4,619 | $1,912 | Implemented |
ST0026 # 01 Y:1985 | 01 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $292 | $60 | Not Implemented |
ST0026 # 02 Y:1985 | 02 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,867 | $40 | Not Implemented |
ST0026 # 03 Y:1985 | 03 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $607 | $0 | Not Implemented |
ST0026 # 04 Y:1985 | 04 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $706 | $1,700 | Not Implemented |
ST0026 # 05 Y:1985 | 05 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $29,188 | $16,200 | Not Implemented |
ST0026 # 06 Y:1985 | 06 | 1985 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $6,181 | $0 | Not Implemented |
ST0026 # 07 Y:1985 | 07 | 1985 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,096 | $400 | Not Implemented |
ST0026 # 08 Y:1985 | 08 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $712 | $537 | Not Implemented |