Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,389
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0555 # 06 Y:2024 | 06 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,650 | $115 | Implemented |
SU0555 # 14 Y:2024 | 14 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,140 | $35,125 | Implemented |
SU0555 # 09 Y:2024 | 09 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $603 | $344 | Implemented |
SU0555 # 10 Y:2024 | 10 | 2024 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $1,795 | $1,172 | Implemented |
SU0555 # 01 Y:2024 | 01 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $923 | $0 | Implemented |
SU0555 # 11 Y:2024 | 11 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $823 | $1,347 | Implemented |
SU0555 # 15 Y:2024 | 15 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $31,541 | $219,132 | Implemented |
SU0555 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,994 | $104 | Implemented |
SU0554 # 08 Y:2024 | 08 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $82,048 | $526,750 | Implemented |
SU0554 # 09 Y:2024 | 09 | 2024 | USE HEAT PUMP FOR SPACE CONDITIONING | $12,437 | $105,375 | Implemented |
SU0554 # 05 Y:2024 | 05 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $5,553 | $84 | Implemented |
SU0554 # 02 Y:2024 | 02 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,907 | $0 | Implemented |
SU0554 # 06 Y:2024 | 06 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,419 | $54 | Implemented |
LE0574 # 03 Y:2024 | 03 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $32,332 | $69,375 | Implemented |
LE0574 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,430 | $5,760 | Implemented |
LE0574 # 05 Y:2024 | 05 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $14,969 | $45,000 | Implemented |
LE0574 # 01 Y:2024 | 01 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $11,872 | $2,400 | Implemented |
NT0022 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,989 | $2,640 | Implemented |
LE0572 # 05 Y:2024 | 05 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,754 | $4,000 | Implemented |
LE0572 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,039 | $0 | Implemented |
LE0572 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,224 | $13,206 | Implemented |
LE0572 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,562 | $4,791 | Implemented |
LE0572 # 01 Y:2024 | 01 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $812 | $0 | Implemented |
WV0663 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,933 | $4,143 | Implemented |
WV0663 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,906 | $461 | Implemented |