Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
191
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0148 # 05 Y:2008 | 05 | 2008 | USE POWER DURING OFF-PEAK PERIODS | $55 | $0 | Implemented |
IC0148 # 06 Y:2008 | 06 | 2008 | INSULATE BARE EQUIPMENT | $1,124 | $913 | Implemented |
IC0148 # 03 Y:2008 | 03 | 2008 | INSTALL OCCUPANCY SENSORS | $1,624 | $2,693 | Implemented |
IC0147 # 03 Y:2008 | 03 | 2008 | INSTALL OCCUPANCY SENSORS | $1,712 | $2,967 | Implemented |
IC0147 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,889 | $55,200 | Implemented |
IC0147 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,453 | $75,348 | Implemented |
IC0147 # 04 Y:2008 | 04 | 2008 | DISCONNECT BALLASTS | $4,311 | $4,750 | Implemented |
IC0147 # 05 Y:2008 | 05 | 2008 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $395 | $250 | Implemented |
IC0147 # 06 Y:2008 | 06 | 2008 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $24,605 | $0 | Implemented |
IC0147 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $133 | $398 | Implemented |
IC0147 # 08 Y:2008 | 08 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,952 | $15,562 | Implemented |
IC0147 # 09 Y:2008 | 09 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $200 | $246 | Implemented |
IC0147 # 13 Y:2008 | 13 | 2008 | UPGRADE OBSOLETE EQUIPMENT | $17,075 | $5,520 | Implemented |
IC0147 # 10 Y:2008 | 10 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,527 | $30,225 | Implemented |
MZ0024 # 01 Y:2008 | 01 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $764 | $900 | Implemented |
MZ0024 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,181 | $32,800 | Implemented |
IC0147 # 11 Y:2008 | 11 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,598 | $9,911 | Implemented |
IC0147 # 15 Y:2008 | 15 | 2008 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $5,100 | $0 | Implemented |
IC0147 # 12 Y:2008 | 12 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,138 | $1,380 | Implemented |
IC0147 # 14 Y:2008 | 14 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,784 | $8,670 | Implemented |
OK0768 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,704 | $17,980 | Implemented |
OK0768 # 12 Y:2008 | 12 | 2008 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $7,034 | $129,640 | Implemented |
OK0768 # 14 Y:2008 | 14 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,760 | $7,525 | Implemented |
OK0768 # 15 Y:2008 | 15 | 2008 | IMPROVE COMBUSTION CONTROL CAPABILITY | $131,460 | $41,080 | Implemented |
OK0768 # 13 Y:2008 | 13 | 2008 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $25,952 | $64,800 | Implemented |