IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,274

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0548 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,104 $482 Implemented
NV0028 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,290 $543 Implemented
NV0028 # 05 Y:1995 05 1995 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $6,854 $4,119 Implemented
NV0028 # 06 Y:1995 06 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $165 $0 Implemented
DS0024 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,101 $4,673 Implemented
AS0143 # 01 Y:1995 01 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,285 $17,600 Implemented
AS0143 # 02 Y:1995 02 1995 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $13,244 $60,000 Implemented
AS0143 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,764 $5,461 Implemented
AS0143 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,544 $0 Implemented
AS0143 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,823 $500 Implemented
AS0143 # 06 Y:1995 06 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $349 $599 Implemented
AS0143 # 07 Y:1995 07 1995 INSULATE BARE EQUIPMENT $8,829 $10,900 Implemented
AS0143 # 09 Y:1995 09 1995 ADJUST BURNERS FOR EFFICIENT OPERATION $1,479 $2,000 Implemented
AS0143 # 10 Y:1995 10 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $163 $115 Implemented
OK0465 # 01 Y:1995 01 1995 UPGRADE CONTROLS ON COMPRESSORS $11,014 $10,115 Implemented
OK0465 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,695 $90 Implemented
OK0465 # 05 Y:1995 05 1995 USE PHOTOCELL CONTROLS $897 $936 Implemented
OK0465 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $726 $870 Implemented
UL0124 # 04 Y:1995 04 1995 OPTIMIZE PLANT POWER FACTOR $977 $1,120 Implemented
TN0547 # 01 Y:1995 01 1995 INSTALL TIMERS AND/OR THERMOSTATS $8,342 $5,800 Implemented
TN0547 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $716 $468 Implemented
TN0547 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $131 $98 Implemented
WV0059 # 02 Y:1995 02 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,147 $4,000 Implemented
WV0059 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $539 $280 Implemented
IA0110 # 01 Y:1995 01 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,304 $79,400 Implemented