IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,274

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0013 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,964 $0 Implemented
UF0013 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,775 $21,477 Implemented
UF0013 # 06 Y:1991 06 1991 KEEP LAMPS AND REFLECTORS CLEAN $6,364 $0 Implemented
UF0013 # 07 Y:1991 07 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,089 $1,892 Implemented
UF0013 # 08 Y:1991 08 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,841 $3,067 Implemented
UF0013 # 09 Y:1991 09 1991 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $756 $880 Implemented
UF0013 # 10 Y:1991 10 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,713 $20,700 Implemented
RU0124 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,053 $0 Implemented
RU0124 # 02 Y:1991 02 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,332 $272 Implemented
RU0124 # 03 Y:1991 03 1991 IMPROVE LUBRICATION PRACTICES $2,430 $800 Implemented
RU0124 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,576 $326 Implemented
RU0124 # 05 Y:1991 05 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,108 $500 Implemented
RU0124 # 06 Y:1991 06 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,769 $0 Implemented
GT0446 # 01 Y:1991 01 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $15,430 $0 Implemented
GT0446 # 02 Y:1991 02 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $439 $140 Implemented
GT0446 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,377 $0 Implemented
GT0446 # 04 Y:1991 04 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $120 $30 Implemented
GT0446 # 05 Y:1991 05 1991 INSTALL TIMERS AND/OR THERMOSTATS $18,000 $300 Implemented
GT0446 # 06 Y:1991 06 1991 INSTALL / REPAIR INSULATION ON STEAM LINES $80 $130 Implemented
GT0446 # 07 Y:1991 07 1991 COVER OPEN TANKS $9,880 $7,550 Implemented
KU0351 # 01 Y:1991 01 1991 INSTALL TIMERS AND/OR THERMOSTATS $5,020 $3,380 Implemented
KU0351 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,664 $744 Implemented
KU0351 # 03 Y:1991 03 1991 INSTALL SET-BACK TIMERS $693 $400 Implemented
KU0351 # 04 Y:1991 04 1991 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,047 $1,600 Implemented
KU0351 # 05 Y:1991 05 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $662 $0 Implemented