Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,274
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0253 # 06 Y:1988 | 06 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,613 | $0 | Implemented |
OK0253 # 08 Y:1988 | 08 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $44 | $88 | Implemented |
RU0026 # 03 Y:1988 | 03 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,924 | $0 | Implemented |
RU0026 # 04 Y:1988 | 04 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,455 | $6,700 | Implemented |
RU0026 # 05 Y:1988 | 05 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $499 | $302 | Implemented |
RU0026 # 06 Y:1988 | 06 | 1988 | REPAIR AND ELIMINATE STEAM LEAKS | $6,034 | $0 | Implemented |
UD0260 # 01 Y:1988 | 01 | 1988 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $4,647 | $500 | Implemented |
UD0260 # 03 Y:1988 | 03 | 1988 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,025 | $2,000 | Implemented |
UD0260 # 04 Y:1988 | 04 | 1988 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $1,447 | $0 | Implemented |
UD0260 # 05 Y:1988 | 05 | 1988 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,399 | $180 | Implemented |
UD0263 # 01 Y:1988 | 01 | 1988 | OPTIMIZE PLANT POWER FACTOR | $4,019 | $15,000 | Implemented |
UD0263 # 03 Y:1988 | 03 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,423 | $1,000 | Implemented |
UD0263 # 05 Y:1988 | 05 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,981 | $1,500 | Implemented |
UD0263 # 06 Y:1988 | 06 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,295 | $9,000 | Implemented |
TN0344 # 02 Y:1988 | 02 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,098 | $1,850 | Implemented |
TN0344 # 04 Y:1988 | 04 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,521 | $1,313 | Implemented |
TN0344 # 06 Y:1988 | 06 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $840 | $1,200 | Implemented |
TN0341 # 02 Y:1988 | 02 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $1,849 | $128 | Implemented |
TN0341 # 05 Y:1988 | 05 | 1988 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $2,054 | $0 | Implemented |
TN0341 # 07 Y:1988 | 07 | 1988 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $429 | $1,600 | Implemented |
UD0259 # 01 Y:1988 | 01 | 1988 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $182 | $0 | Implemented |
UD0259 # 03 Y:1988 | 03 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $168 | $64 | Implemented |
WI0025 # 02 Y:1988 | 02 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $470 | $0 | Implemented |
WI0025 # 03 Y:1988 | 03 | 1988 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,213 | $0 | Implemented |
WI0025 # 05 Y:1988 | 05 | 1988 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $143 | $0 | Implemented |