IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,274

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0057 # 05 Y:1986 05 1986 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $2,262 $7,500 Implemented
KU0193 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,876 $5,003 Implemented
KU0193 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $769 $100 Implemented
KU0193 # 03 Y:1986 03 1986 INSTALL TIMERS AND/OR THERMOSTATS $4,524 $667 Implemented
KU0193 # 05 Y:1986 05 1986 INSTALL AUTOMATIC STACK DAMPER $1,097 $500 Implemented
KU0193 # 08 Y:1986 08 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $111 $0 Implemented
KU0194 # 01 Y:1986 01 1986 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $1,687 $0 Implemented
KU0194 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,003 $1,575 Implemented
KU0194 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $393 $50 Implemented
ST0055 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,705 $571 Implemented
ST0055 # 02 Y:1986 02 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $731 $0 Implemented
ST0055 # 03 Y:1986 03 1986 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $5,219 $10,500 Implemented
ST0055 # 04 Y:1986 04 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $417 $250 Implemented
ST0055 # 05 Y:1986 05 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $626 $0 Implemented
ST0055 # 06 Y:1986 06 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,030 $3,750 Implemented
ST0055 # 07 Y:1986 07 1986 RECOVER WASTE HEAT FROM EQUIPMENT $834 $2,400 Implemented
ST0053 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,959 $140 Implemented
ST0053 # 08 Y:1986 08 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,913 $0 Implemented
OK0187 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $116 $103 Implemented
OK0187 # 02 Y:1986 02 1986 INSTALL TIMERS AND/OR THERMOSTATS $277 $700 Implemented
OK0187 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $125 $40 Implemented
UD0188 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,133 $13,400 Implemented
KU0187 # 01 Y:1986 01 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,097 $193 Implemented
KU0187 # 02 Y:1986 02 1986 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $1,550 $2,000 Implemented
KU0187 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $218 $0 Implemented