Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,274
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0263 # 06 Y:1985 | 06 | 1985 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $21,300 | $400 | Implemented |
AT0005 # 01 Y:1985 | 01 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $490 | $1,183 | Implemented |
AT0005 # 02 Y:1985 | 02 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,390 | $300 | Implemented |
AT0005 # 03 Y:1985 | 03 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $291 | $400 | Implemented |
AT0005 # 04 Y:1985 | 04 | 1985 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $3,384 | $226 | Implemented |
AT0005 # 06 Y:1985 | 06 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $24,347 | $1,200 | Implemented |
UD0165 # 04 Y:1985 | 04 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,135 | $2,000 | Implemented |
UD0165 # 05 Y:1985 | 05 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,934 | $4,600 | Implemented |
UD0165 # 06 Y:1985 | 06 | 1985 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $3,435 | $0 | Implemented |
UD0165 # 07 Y:1985 | 07 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,848 | $1,500 | Implemented |
TN0247 # 01 Y:1985 | 01 | 1985 | REDESIGN PROCESS | $8,108 | $2,000 | Implemented |
TN0247 # 02 Y:1985 | 02 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,753 | $135 | Implemented |
TN0247 # 03 Y:1985 | 03 | 1985 | INSULATE BARE EQUIPMENT | $808 | $500 | Implemented |
TN0248 # 01 Y:1985 | 01 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,966 | $375 | Implemented |
TN0248 # 02 Y:1985 | 02 | 1985 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,354 | $4,000 | Implemented |
TN0248 # 03 Y:1985 | 03 | 1985 | COVER OPEN TANKS | $1,628 | $800 | Implemented |
TN0248 # 04 Y:1985 | 04 | 1985 | INSULATE BARE EQUIPMENT | $1,044 | $750 | Implemented |
TN0248 # 06 Y:1985 | 06 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $967 | $0 | Implemented |
TN0248 # 07 Y:1985 | 07 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $457 | $500 | Implemented |
TN0249 # 01 Y:1985 | 01 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,085 | $583 | Implemented |
TN0249 # 02 Y:1985 | 02 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,598 | $0 | Implemented |
TN0249 # 03 Y:1985 | 03 | 1985 | USE MINIMUM STEAM OPERATING PRESSURE | $1,482 | $0 | Implemented |
TN0249 # 04 Y:1985 | 04 | 1985 | INSULATE BARE EQUIPMENT | $984 | $277 | Implemented |
TN0249 # 06 Y:1985 | 06 | 1985 | INSULATE BARE EQUIPMENT | $449 | $172 | Implemented |
TN0249 # 07 Y:1985 | 07 | 1985 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $138 | $40 | Implemented |