IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,274

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0142 # 01 Y:1984 01 1984 AIR CONDITION ONLY SPACE NECESSARY $94,910 $8,142 Implemented
KU0142 # 02 Y:1984 02 1984 INSTALL TIMERS AND/OR THERMOSTATS $43,246 $0 Implemented
KU0142 # 03 Y:1984 03 1984 INSTALL TIMERS AND/OR THERMOSTATS $4,724 $0 Implemented
KU0142 # 04 Y:1984 04 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,695 $2,171 Implemented
KU0142 # 05 Y:1984 05 1984 IMPROVE LUBRICATION PRACTICES $12,405 $9,000 Implemented
KU0142 # 06 Y:1984 06 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,842 $5,000 Implemented
KU0142 # 07 Y:1984 07 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,608 $1,500 Implemented
KU0142 # 13 Y:1984 13 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,360 $3,500 Implemented
KU0142 # 14 Y:1984 14 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,883 $75 Implemented
KU0142 # 16 Y:1984 16 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,606 $0 Implemented
KU0142 # 19 Y:1984 19 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $506 $0 Implemented
KU0143 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,486 $0 Implemented
KU0143 # 02 Y:1984 02 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,840 $0 Implemented
KU0143 # 04 Y:1984 04 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,586 $3,000 Implemented
KU0143 # 05 Y:1984 05 1984 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $4,141 $2,000 Implemented
KU0143 # 10 Y:1984 10 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $620 $920 Implemented
KU0143 # 13 Y:1984 13 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $183 $0 Implemented
ST0004 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $599 $537 Implemented
ST0004 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,185 $200 Implemented
ST0004 # 03 Y:1984 03 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,058 $40 Implemented
ST0004 # 04 Y:1984 04 1984 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $583 $1,480 Implemented
ST0004 # 05 Y:1984 05 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $990 $960 Implemented
ST0004 # 06 Y:1984 06 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $4,135 $845 Implemented
TS0007 # 03 Y:1984 03 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,860 $0 Implemented
TS0007 # 05 Y:1984 05 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $4,243 $0 Implemented