Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,389
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0172 # 04 Y:1985 | 04 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $546 | $0 | Implemented |
UD0168 # 01 Y:1985 | 01 | 1985 | INSTALL SET-BACK TIMERS | $2,610 | $1,000 | Implemented |
UD0168 # 05 Y:1985 | 05 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $506 | $0 | Implemented |
ST0032 # 01 Y:1985 | 01 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $514 | $64 | Implemented |
ST0032 # 04 Y:1985 | 04 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $890 | $1,900 | Implemented |
LT0025 # 01 Y:1985 | 01 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $154 | $300 | Implemented |
LT0025 # 02 Y:1985 | 02 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $537 | $670 | Implemented |
LT0025 # 03 Y:1985 | 03 | 1985 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $6,134 | $500 | Implemented |
LT0025 # 04 Y:1985 | 04 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $531 | $400 | Implemented |
GT0262 # 01 Y:1985 | 01 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,780 | $500 | Implemented |
GT0262 # 02 Y:1985 | 02 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $92 | $27 | Implemented |
GT0262 # 03 Y:1985 | 03 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $165 | $168 | Implemented |
GT0262 # 04 Y:1985 | 04 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $468 | $75 | Implemented |
GT0263 # 01 Y:1985 | 01 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $58,700 | $82,000 | Implemented |
GT0263 # 05 Y:1985 | 05 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $787 | $3,679 | Implemented |
GT0263 # 06 Y:1985 | 06 | 1985 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $21,300 | $400 | Implemented |
AT0005 # 01 Y:1985 | 01 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $490 | $1,183 | Implemented |
AT0005 # 02 Y:1985 | 02 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,390 | $300 | Implemented |
AT0005 # 03 Y:1985 | 03 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $291 | $400 | Implemented |
AT0005 # 04 Y:1985 | 04 | 1985 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $3,384 | $226 | Implemented |
AT0005 # 06 Y:1985 | 06 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $24,347 | $1,200 | Implemented |
UD0165 # 04 Y:1985 | 04 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,135 | $2,000 | Implemented |
UD0165 # 05 Y:1985 | 05 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,934 | $4,600 | Implemented |
UD0165 # 06 Y:1985 | 06 | 1985 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $3,435 | $0 | Implemented |
UD0165 # 07 Y:1985 | 07 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,848 | $1,500 | Implemented |