Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

622

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SJ0011 # 07 Y:2024 07 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,389 $0 Implemented
SD0646 # 08 Y:2024 08 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,221 $10,759 Implemented
SD0646 # 06 Y:2024 06 2024 ADOPT IN-HOUSE MATERIAL GENERATION $32,881 $97,356 Implemented
SD0646 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $81,600 $250,043 Implemented
SD0646 # 01 Y:2024 01 2024 INSTALL TIMERS AND/OR THERMOSTATS $678 $180 Implemented
SD0646 # 11 Y:2024 11 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $516 $250 Implemented
SD0646 # 02 Y:2024 02 2024 ADJUST BURNERS FOR EFFICIENT OPERATION $16,626 $6,076 Implemented
SD0646 # 09 Y:2024 09 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $276 $932 Implemented
SD0646 # 05 Y:2024 05 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $8,600 $0 Implemented
SD0646 # 03 Y:2024 03 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $503 $614 Implemented
SD0646 # 12 Y:2024 12 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,254 $250 Implemented
SD0646 # 10 Y:2024 10 2024 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $4,515 $6,200 Implemented
SF0607 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $6,168 $0 Implemented
SF0607 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,524 $11,610 Implemented
SF0607 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,399 $8,086 Implemented
SF0607 # 02 Y:2023 02 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,963 $344 Implemented
SF0607 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $41,060 $346,427 Implemented
CI0015 # 02 Y:2023 02 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $36,511 $165,000 Implemented
SJ0002 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,772 $0 Implemented
SJ0002 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,741 $652 Implemented
SJ0002 # 04 Y:2023 04 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,185 $0 Implemented
SJ0002 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,309 $22,700 Implemented
SJ0002 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $424 $194 Implemented
SD0623 # 01 Y:2023 01 2023 PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) $49,875 $0 Implemented
CI0005 # 09 Y:2022 09 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $563 $500 Implemented