IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0750 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,138 $9,144 Not Implemented
MA0750 # 05 Y:2015 05 2015 IMPROVE COMBUSTION CONTROL CAPABILITY $5,289 $2,500 Not Implemented
MA0750 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,208 $3,000 Not Implemented
MA0750 # 03 Y:2015 03 2015 REDUCE VENTILATION AIR $15,229 $15,000 Not Implemented
MA0750 # 02 Y:2015 02 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $16,398 $7,000 Not Implemented
MA0750 # 01 Y:2015 01 2015 REDUCE VENTILATION AIR $18,184 $10,420 Not Implemented
MA0750 # 08 Y:2015 08 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $537 $100 Not Implemented
MA0750 # 07 Y:2015 07 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $3,007 $1,500 Not Implemented
MA0545 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $199 $795 Implemented
MA0545 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $219 $0 Implemented
MA0545 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $601 $0 Implemented
MA0545 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $867 $340 Implemented
MA0545 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,737 $2,750 Implemented
MA0545 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,190 $0 Implemented
MA0512 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,144 $170 Implemented
MA0512 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,153 $1,000 Implemented
MA0512 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $29,628 $24,650 Not Implemented
MA0512 # 01 Y:2002 01 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $38,408 $75,000 Not Implemented
ME0280 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,204 $1,000 Not Implemented
ME0280 # 02 Y:1999 02 1999 MOVE PRODUCT USING MECHANICAL MEANS $105,600 $6,000 Implemented
ME0280 # 03 Y:1999 03 1999 MODIFY CURRENT INCENTIVE PROGRAM $15,000 $0 Implemented
ME0280 # 09 Y:1999 09 1999 MODIFY CURRENT INCENTIVE PROGRAM $55,341 $30,500 Implemented
ME0280 # 01 Y:1999 01 1999 INSTALL SENSORS TO DETECT DEFECTS $243,000 $20,108 Implemented
ME0280 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,958 $28,528 Implemented
ME0280 # 07 Y:1999 07 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,619 $1,000 Not Implemented