IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

291

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0009 # 04 Y:2007 04 2007 INSTALL TIMERS AND/OR THERMOSTATS $600 $236 Implemented
UA0009 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $528 $0 Implemented
UA0009 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $768 $525 Implemented
UA0009 # 07 Y:2007 07 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $150 $73 Not Implemented
UA0009 # 08 Y:2007 08 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $324 $567 Not Implemented
UA0009 # 09 Y:2007 09 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $59 $45 Not Implemented
GT0514 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,380 $14,150 Implemented
GT0514 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,010 $7,520 Implemented
GT0514 # 03 Y:1993 03 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,450 $900 Implemented
GT0514 # 04 Y:1993 04 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,600 $10,000 Not Implemented
GT0514 # 05 Y:1993 05 1993 OPTIMIZE PLANT POWER FACTOR $16,240 $25,000 Implemented
GT0514 # 06 Y:1993 06 1993 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $13,150 $40,000 Not Implemented
GT0514 # 07 Y:1993 07 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,860 $17,100 Not Implemented
GT0328 # 01 Y:1987 01 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $616 $644 Implemented
GT0328 # 02 Y:1987 02 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,314 $3,240 Not Implemented
GT0328 # 03 Y:1987 03 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,760 $400 Not Implemented
GT0328 # 04 Y:1987 04 1987 INSULATE BARE EQUIPMENT $160 $500 Implemented
GT0328 # 05 Y:1987 05 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,290 $450 Implemented
GT0329 # 01 Y:1987 01 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,150 $1,000 Not Implemented
GT0329 # 02 Y:1987 02 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,456 $1,000 Not Implemented
GT0329 # 03 Y:1987 03 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $756 $300 Not Implemented
GT0329 # 04 Y:1987 04 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $21,756 $30,000 Not Implemented
GT0329 # 05 Y:1987 05 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $81,476 $57,000 Not Implemented
GT0329 # 06 Y:1987 06 1987 INSULATE BARE EQUIPMENT $1,160 $1,500 Not Implemented
GT0329 # 07 Y:1987 07 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $357 $1,282 Implemented