Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
364
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0339 # 05 Y:1995 | 05 | 1995 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $57,939 | $118,450 | Not Implemented |
MA0339 # 06 Y:1995 | 06 | 1995 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $23,990 | $500 | Not Implemented |
MA0339 # 07 Y:1995 | 07 | 1995 | REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS | $824 | $3,000 | Not Implemented |
MA0336 # 01 Y:1995 | 01 | 1995 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $1,427 | $0 | Implemented |
MA0336 # 02 Y:1995 | 02 | 1995 | INSTALL OCCUPANCY SENSORS | $854 | $2,191 | Not Implemented |
MA0336 # 03 Y:1995 | 03 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $595 | $580 | Implemented |
MA0336 # 04 Y:1995 | 04 | 1995 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $582 | $0 | Implemented |
MA0336 # 05 Y:1995 | 05 | 1995 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $461 | $0 | Implemented |
MA0334 # 01 Y:1995 | 01 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,139 | $0 | Implemented |
MA0334 # 02 Y:1995 | 02 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,782 | $29,500 | Not Implemented |
MA0334 # 03 Y:1995 | 03 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,022 | $1,120 | Implemented |
MA0334 # 04 Y:1995 | 04 | 1995 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,019 | $2,605 | Implemented |
MA0334 # 05 Y:1995 | 05 | 1995 | INSTALL OCCUPANCY SENSORS | $610 | $490 | Not Implemented |
MA0334 # 06 Y:1995 | 06 | 1995 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $4,873 | $6,384 | Not Implemented |
MA0334 # 07 Y:1995 | 07 | 1995 | USE EVAPORATION TO CONCENTRATE MATERIAL | $3,553 | $0 | Implemented |
MA0334 # 08 Y:1995 | 08 | 1995 | MINIMIZE WATER USAGE | $514 | $0 | Implemented |
MA0310 # 01 Y:1994 | 01 | 1994 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $30,270 | $59,522 | Implemented |
MA0310 # 02 Y:1994 | 02 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,790 | $23,672 | Not Implemented |
MA0310 # 03 Y:1994 | 03 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,605 | $0 | Implemented |
MA0310 # 04 Y:1994 | 04 | 1994 | USE RADIANT HEATER FOR SPOT HEATING | $5,208 | $6,560 | Implemented |
MA0310 # 05 Y:1994 | 05 | 1994 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,090 | $0 | Not Implemented |
MA0310 # 06 Y:1994 | 06 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $323 | $225 | Not Implemented |
MA0310 # 07 Y:1994 | 07 | 1994 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $9,505 | $2,697 | Implemented |
MA0310 # 08 Y:1994 | 08 | 1994 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,800 | $0 | Implemented |
MA0303 # 01 Y:1994 | 01 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,413 | $644 | Not Implemented |