IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

364

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0339 # 05 Y:1995 05 1995 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $57,939 $118,450 Not Implemented
MA0339 # 06 Y:1995 06 1995 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $23,990 $500 Not Implemented
MA0339 # 07 Y:1995 07 1995 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $824 $3,000 Not Implemented
MA0336 # 01 Y:1995 01 1995 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $1,427 $0 Implemented
MA0336 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $854 $2,191 Not Implemented
MA0336 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $595 $580 Implemented
MA0336 # 04 Y:1995 04 1995 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $582 $0 Implemented
MA0336 # 05 Y:1995 05 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $461 $0 Implemented
MA0334 # 01 Y:1995 01 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,139 $0 Implemented
MA0334 # 02 Y:1995 02 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,782 $29,500 Not Implemented
MA0334 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,022 $1,120 Implemented
MA0334 # 04 Y:1995 04 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,019 $2,605 Implemented
MA0334 # 05 Y:1995 05 1995 INSTALL OCCUPANCY SENSORS $610 $490 Not Implemented
MA0334 # 06 Y:1995 06 1995 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $4,873 $6,384 Not Implemented
MA0334 # 07 Y:1995 07 1995 USE EVAPORATION TO CONCENTRATE MATERIAL $3,553 $0 Implemented
MA0334 # 08 Y:1995 08 1995 MINIMIZE WATER USAGE $514 $0 Implemented
MA0310 # 01 Y:1994 01 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $30,270 $59,522 Implemented
MA0310 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $5,790 $23,672 Not Implemented
MA0310 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,605 $0 Implemented
MA0310 # 04 Y:1994 04 1994 USE RADIANT HEATER FOR SPOT HEATING $5,208 $6,560 Implemented
MA0310 # 05 Y:1994 05 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,090 $0 Not Implemented
MA0310 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $323 $225 Not Implemented
MA0310 # 07 Y:1994 07 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,505 $2,697 Implemented
MA0310 # 08 Y:1994 08 1994 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,800 $0 Implemented
MA0303 # 01 Y:1994 01 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,413 $644 Not Implemented