IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

525

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0220 # 07 Y:1998 07 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,924 $60 Not Implemented
AS0220 # 08 Y:1998 08 1998 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,895 $12,030 Implemented
AS0220 # 09 Y:1998 09 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,801 $100 Implemented
AS0220 # 10 Y:1998 10 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,606 $5,027 Not Implemented
AS0220 # 11 Y:1998 11 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,179 $90 Implemented
AS0220 # 12 Y:1998 12 1998 ADOPT IN-HOUSE MATERIAL GENERATION $192,015 $2,940 Not Implemented
AS0220 # 13 Y:1998 13 1998 ADD ADDITIONAL PRODUCTION SHIFT $495,547 $14,720 Implemented
AS0219 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,150 $2,888 Implemented
AS0219 # 02 Y:1998 02 1998 USE SYNTHETIC LUBRICANT $101 $268 Implemented
AS0219 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,071 $60 Implemented
AS0219 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,138 $2,957 Implemented
AS0219 # 05 Y:1998 05 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,425 $1,500 Implemented
AS0219 # 06 Y:1998 06 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $36 $30 Implemented
AS0219 # 07 Y:1998 07 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $72,920 $15,300 Not Implemented
AS0219 # 08 Y:1998 08 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $5,983 $10,352 Not Implemented
AS0216 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,639 $5,513 Not Implemented
AS0216 # 02 Y:1998 02 1998 INSTALL OCCUPANCY SENSORS $766 $750 Not Implemented
AS0216 # 03 Y:1998 03 1998 DISCONNECT BALLASTS $183 $15 Not Implemented
AS0216 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,042 $60 Not Implemented
AS0216 # 05 Y:1998 05 1998 INSTALL TIMERS AND/OR THERMOSTATS $671 $375 Not Implemented
AS0216 # 06 Y:1998 06 1998 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,307 $940 Implemented
AS0216 # 07 Y:1998 07 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $444 $60 Not Implemented
AS0216 # 08 Y:1998 08 1998 ADOPT IN-HOUSE MATERIAL GENERATION $2,435 $375 Implemented
AS0216 # 09 Y:1998 09 1998 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $35,483 $960 Implemented
AS0215 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,408 $2,681 Implemented