IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

853

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0728 # 07 Y:2006 07 2006 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,500 $0 Not Implemented
OK0723 # 01 Y:2006 01 2006 OPERATE BOILERS ON HIGH FIRE SETTING $23,600 $18,000 Implemented
OK0723 # 02 Y:2006 02 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $7,849 $10,033 Not Implemented
OK0723 # 03 Y:2006 03 2006 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,135 $587 Implemented
OK0723 # 04 Y:2006 04 2006 REPAIR OR REPLACE STEAM TRAPS $1,065 $2,539 Not Implemented
OK0723 # 05 Y:2006 05 2006 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,531 $5,250 Implemented
OK0723 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,876 $17,879 Implemented
OK0723 # 07 Y:2006 07 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,395 $7,192 Not Implemented
OK0723 # 08 Y:2006 08 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,096 $42,002 Implemented
OK0723 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,836 $9,913 Not Implemented
OK0686 # 01 Y:2004 01 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,360 $160 Not Implemented
OK0686 # 02 Y:2004 02 2004 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,472 $262 Implemented
OK0686 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $3,350 $1,136 Implemented
OK0686 # 04 Y:2004 04 2004 INSTALL SET-BACK TIMERS $1,577 $1,320 Implemented
OK0686 # 05 Y:2004 05 2004 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $70,533 $81,950 Not Implemented
OK0686 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,153 $36,618 Implemented
OK0686 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $537 $2,550 Implemented
OK0686 # 08 Y:2004 08 2004 USE OPTIMUM THICKNESS INSULATION $8,220 $40,318 Not Implemented
OK0686 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,706 $22,116 Not Implemented
OK0674 # 01 Y:2003 01 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,662 $13,792 Implemented
OK0674 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $748 $0 Not Implemented
OK0674 # 03 Y:2003 03 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,400 $0 Not Implemented
OK0674 # 04 Y:2003 04 2003 CHANGE OPERATING CONDITIONS $28,500 $40,604 Not Implemented
OK0674 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $143 $184 Not Implemented
OK0667 # 01 Y:2003 01 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,098 $4,390 Not Implemented