IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

546

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0137 # 07 Y:1994 07 1994 RECOVER WASTE HEAT FROM EQUIPMENT $6,915 $30,000 Not Implemented
UD0435 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $7,057 $10,000 Implemented
UD0435 # 02 Y:1994 02 1994 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,501 $0 Implemented
UD0435 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $3,090 $5,000 Not Implemented
UD0435 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,265 $6,838 Not Implemented
UD0435 # 05 Y:1994 05 1994 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $28,851 $50,000 Not Implemented
OR0209 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $732 $750 Not Implemented
OR0209 # 02 Y:1994 02 1994 IMPROVE COMBUSTION CONTROL CAPABILITY $27,860 $12,000 Implemented
OR0209 # 03 Y:1994 03 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $274 $0 Implemented
OR0209 # 04 Y:1994 04 1994 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,640 $2,670 Implemented
OR0209 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $185 $248 Implemented
OR0209 # 06 Y:1994 06 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $67,700 $260,000 Implemented
UL0101 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,975 $8,590 n/a
UL0101 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,444 $696 n/a
UL0101 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,055 $3,163 n/a
UL0101 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $420 $150 n/a
UL0101 # 05 Y:1994 05 1994 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $3,325 $10,000 n/a
UL0101 # 06 Y:1994 06 1994 INSULATE BARE EQUIPMENT $791 $588 n/a
UL0101 # 07 Y:1994 07 1994 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $3,085 $1,000 n/a
UL0101 # 08 Y:1994 08 1994 INSULATE BARE EQUIPMENT $463 $558 n/a
UF0089 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,347 $2,246 Not Implemented
UF0089 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,449 $1,820 Not Implemented
UF0089 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $534 $1,126 Not Implemented
UF0089 # 04 Y:1994 04 1994 INSTALL OCCUPANCY SENSORS $1,191 $320 Not Implemented
UF0089 # 05 Y:1994 05 1994 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,372 $1,940 Not Implemented