Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,208
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0081 # 01 Y:2017 | 01 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,110 | $0 | Implemented |
IP0081 # 02 Y:2017 | 02 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,216 | $0 | Implemented |
IP0081 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $72 | $0 | Implemented |
IP0081 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,798 | $35 | Implemented |
IP0081 # 05 Y:2017 | 05 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,865 | $390 | Implemented |
IP0081 # 06 Y:2017 | 06 | 2017 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $25 | $17 | Not Implemented |
IP0081 # 07 Y:2017 | 07 | 2017 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $1,643 | $1,949 | Not Implemented |
IP0081 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $832 | $1,358 | Implemented |
IP0081 # 09 Y:2017 | 09 | 2017 | INSTALL OCCUPANCY SENSORS | $201 | $409 | Implemented |
IP0081 # 10 Y:2017 | 10 | 2017 | REPLACE AIR CURTAIN DOORS WITH SOLID DOORS | $1,766 | $3,788 | Not Implemented |
WV0541 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $62,969 | $252,894 | Not Implemented |
WV0541 # 02 Y:2017 | 02 | 2017 | INSTALL SENSORS TO DETECT DEFECTS | $60,138 | $100,000 | Not Implemented |
WV0541 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $40,630 | $534 | Implemented |
WV0541 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,042 | $29,880 | Not Implemented |
WV0541 # 05 Y:2017 | 05 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $29,320 | $72,000 | Not Implemented |
WV0541 # 06 Y:2017 | 06 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $13,353 | $1,514 | Implemented |
WV0541 # 07 Y:2017 | 07 | 2017 | INSULATE BARE EQUIPMENT | $3,860 | $2,024 | Implemented |
WV0541 # 08 Y:2017 | 08 | 2017 | USE EVAPORATION TO CONCENTRATE MATERIAL | $1,206 | $5,500 | Not Implemented |
WV0541 # 09 Y:2017 | 09 | 2017 | INSTALL OCCUPANCY SENSORS | $869 | $1,671 | Implemented |
MA0769 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $90,487 | $39,330 | Implemented |
MA0769 # 02 Y:2017 | 02 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $30,931 | $24,720 | Not Implemented |
MA0769 # 03 Y:2017 | 03 | 2017 | INSULATE BARE EQUIPMENT | $12,391 | $11,273 | Not Implemented |
MA0769 # 04 Y:2017 | 04 | 2017 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $8,620 | $57,572 | Not Implemented |
MA0769 # 05 Y:2017 | 05 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,874 | $7,200 | Not Implemented |
WV0540 # 01 Y:2017 | 01 | 2017 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $14,599 | $10,000 | Not Implemented |