Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
548
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0039 # 02 Y:2002 | 02 | 2002 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $73,631 | $42,600 | n/a |
MI0039 # 03 Y:2002 | 03 | 2002 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,440 | $3,600 | n/a |
MI0039 # 04 Y:2002 | 04 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,734 | $1,300 | n/a |
MI0039 # 05 Y:2002 | 05 | 2002 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,717 | $7 | n/a |
MI0028 # 01 Y:2002 | 01 | 2002 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $61,673 | $3,000 | n/a |
MI0028 # 02 Y:2002 | 02 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $15,305 | $930 | n/a |
MI0028 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,032 | $255 | n/a |
MI0028 # 04 Y:2002 | 04 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,051 | $8 | n/a |
MI0028 # 05 Y:2002 | 05 | 2002 | RECYCLE WHITE WATER | $5,465 | $601 | n/a |
MI0028 # 06 Y:2002 | 06 | 2002 | COVER OPEN TANKS | $149 | $48 | n/a |
UF0286 # 01 Y:2001 | 01 | 2001 | INSTALL OCCUPANCY SENSORS | $1,664 | $805 | Not Implemented |
UF0286 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,182 | $410 | Implemented |
UF0286 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,194 | $0 | Not Implemented |
UF0286 # 04 Y:2001 | 04 | 2001 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $16,196 | $19,500 | Not Implemented |
UF0286 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,470 | $8,362 | Implemented |
UF0286 # 06 Y:2001 | 06 | 2001 | ADD AREA LIGHTING SWITCHES | $648 | $232 | Implemented |
UF0286 # 07 Y:2001 | 07 | 2001 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $5,353 | $15,176 | Not Implemented |
UF0286 # 08 Y:2001 | 08 | 2001 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,201 | $30,000 | Implemented |
UF0286 # 09 Y:2001 | 09 | 2001 | USE HIGH PRESSURE WASH SYSTEMS | $41,558 | $175,800 | Not Implemented |
UF0286 # 10 Y:2001 | 10 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,165 | $5,237 | Not Implemented |
MI0023 # 01 Y:2001 | 01 | 2001 | METER WASTE WATER | $2,223 | $3,650 | Not Implemented |
MI0023 # 02 Y:2001 | 02 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $69,120 | $150,000 | Not Implemented |
MI0023 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,387 | $3 | Not Implemented |
MI0023 # 04 Y:2001 | 04 | 2001 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $11,384 | $143 | Not Implemented |
MI0023 # 05 Y:2001 | 05 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $22,932 | $2 | Not Implemented |