Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
787
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0101 # 09 Y:2005 | 09 | 2005 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $2,015 | $0 | Not Implemented |
IC0101 # 10 Y:2005 | 10 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,235 | $11,173 | Not Implemented |
IC0101 # 11 Y:2005 | 11 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $893 | $1,023 | Not Implemented |
IC0098 # 01 Y:2005 | 01 | 2005 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $64,389 | $324,232 | Not Implemented |
IC0098 # 02 Y:2005 | 02 | 2005 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $5,945 | $13,700 | Implemented |
IC0098 # 03 Y:2005 | 03 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,381 | $0 | Implemented |
IC0098 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES | $14,532 | $1,400 | Not Implemented |
IC0098 # 05 Y:2005 | 05 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,517 | $0 | Not Implemented |
IC0098 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,283 | $6,200 | Not Implemented |
UM0266 # 01 Y:2004 | 01 | 2004 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $11,825 | $4,500 | Implemented |
UM0266 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,131 | $7,512 | Implemented |
UM0266 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,042 | $900 | Implemented |
UM0266 # 04 Y:2004 | 04 | 2004 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,182 | $1,000 | Not Implemented |
UM0266 # 05 Y:2004 | 05 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,847 | $2,000 | Implemented |
UM0266 # 06 Y:2004 | 06 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,400 | $700 | Not Implemented |
UM0266 # 07 Y:2004 | 07 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,312 | $3,500 | Not Implemented |
UM0266 # 08 Y:2004 | 08 | 2004 | REVISE SMOKE CLEANUP FROM OPERATIONS | $1,614 | $500 | Implemented |
UM0266 # 09 Y:2004 | 09 | 2004 | INSTALL OCCUPANCY SENSORS | $1,195 | $603 | Not Implemented |
UM0266 # 10 Y:2004 | 10 | 2004 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $666 | $610 | Implemented |
UD0671 # 01 Y:2003 | 01 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $137,400 | $100,000 | Not Implemented |
UD0671 # 02 Y:2003 | 02 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $17,075 | $70 | Implemented |
UD0671 # 03 Y:2003 | 03 | 2003 | ADD AREA LIGHTING SWITCHES | $12,090 | $15,000 | Not Implemented |
UD0671 # 04 Y:2003 | 04 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,713 | $0 | Not Implemented |
UD0671 # 05 Y:2003 | 05 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,275 | $0 | Implemented |
UD0671 # 06 Y:2003 | 06 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,103 | $442 | Not Implemented |