Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,620
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0470 # 02 Y:2013 | 02 | 2013 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $16,582 | $68,000 | Implemented |
WV0470 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,807 | $20,200 | Not Implemented |
WV0470 # 04 Y:2013 | 04 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,666 | $1,080 | Implemented |
WV0470 # 05 Y:2013 | 05 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,422 | $13,020 | Not Implemented |
WV0470 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,069 | $2,050 | Implemented |
WV0470 # 07 Y:2013 | 07 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,736 | $1,700 | Implemented |
WV0470 # 08 Y:2013 | 08 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,892 | $3,300 | Not Implemented |
WV0470 # 09 Y:2013 | 09 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $620 | $105 | Implemented |
WV0470 # 10 Y:2013 | 10 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $152 | $380 | Not Implemented |
WV0469 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,550 | $4,036 | Implemented |
WV0469 # 08 Y:2013 | 08 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,484 | $2,292 | Not Implemented |
WV0469 # 09 Y:2013 | 09 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,378 | $70 | Implemented |
WV0469 # 10 Y:2013 | 10 | 2013 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $706 | $460 | Not Implemented |
WV0469 # 11 Y:2013 | 11 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $314 | $56 | Implemented |
WV0469 # 12 Y:2013 | 12 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $77 | $281 | Not Implemented |
WV0469 # 01 Y:2013 | 01 | 2013 | OPTIMIZE PLANT POWER FACTOR | $21,317 | $6,300 | Not Implemented |
WV0469 # 02 Y:2013 | 02 | 2013 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $11,090 | $1,989 | Implemented |
WV0469 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,896 | $10,694 | Not Implemented |
WV0469 # 04 Y:2013 | 04 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,996 | $0 | Implemented |
WV0469 # 05 Y:2013 | 05 | 2013 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,853 | $5,700 | Not Implemented |
WV0469 # 06 Y:2013 | 06 | 2013 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $5,514 | $1,000 | Implemented |
UD0876 # 01 Y:2013 | 01 | 2013 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $25,570 | $0 | Implemented |
UD0876 # 02 Y:2013 | 02 | 2013 | OPTIMIZE PLANT POWER FACTOR | $3,308 | $12,000 | Not Implemented |
UD0876 # 03 Y:2013 | 03 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,184 | $0 | Implemented |
UD0876 # 04 Y:2013 | 04 | 2013 | BASE UTILITY CHARGES ON USAGE RATHER THAN AREA OCCUPIED | $1,416 | $1,400 | Implemented |