IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

436

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0110 # 07 Y:1991 07 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $346 $800 Implemented
KU0334 # 01 Y:1991 01 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,153 $1,800 Implemented
KU0334 # 02 Y:1991 02 1991 SCHEDULE USE OF ELEVATORS TO CONSERVE ENERGY $336 $40 Implemented
KU0334 # 03 Y:1991 03 1991 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $22,062 $33,150 Implemented
KU0334 # 04 Y:1991 04 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,034 $4,200 Implemented
KU0334 # 05 Y:1991 05 1991 RECOVER WASTE HEAT FROM EQUIPMENT $6,382 $0 Implemented
KU0334 # 06 Y:1991 06 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,054 $16,950 Implemented
KU0334 # 07 Y:1991 07 1991 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $10,665 $22,600 Implemented
KU0334 # 08 Y:1991 08 1991 INSTALL SET-BACK TIMERS $454 $120 Implemented
CO0206 # 01 Y:1991 01 1991 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $900 $2,500 Not Implemented
CO0206 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $561 $157 Not Implemented
CO0206 # 03 Y:1991 03 1991 REDUCE VENTILATION AIR $891 $2,000 Not Implemented
CO0206 # 04 Y:1991 04 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $600 $1,000 Not Implemented
CO0206 # 05 Y:1991 05 1991 COVER OPEN TANKS $823 $580 Not Implemented
CO0206 # 06 Y:1991 06 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $580 $200 Not Implemented
GT0428 # 01 Y:1991 01 1991 OPTIMIZE PLANT POWER FACTOR $429 $0 Implemented
GT0428 # 02 Y:1991 02 1991 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $562 $400 Implemented
GT0428 # 03 Y:1991 03 1991 RECOVER WASTE HEAT FROM EQUIPMENT $1,645 $1,500 Implemented
GT0428 # 04 Y:1991 04 1991 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,170 $2,400 Implemented
GT0428 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $317 $839 Implemented
GT0428 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $68 $563 Implemented
GT0428 # 07 Y:1991 07 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $70 $0 Implemented
GT0428 # 08 Y:1991 08 1991 INSTALL TIMERS AND/OR THERMOSTATS $1,160 $600 Implemented
KU0333 # 01 Y:1991 01 1991 REDESIGN PROCESS $1,119 $0 Implemented
KU0333 # 02 Y:1991 02 1991 INSTALL TIMERS AND/OR THERMOSTATS $3,551 $3,600 Implemented