IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

445

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0169 # 10 Y:2023 10 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,071 $15,432 Implemented
IP0169 # 11 Y:2023 11 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,267 $5,079 Implemented
IP0169 # 12 Y:2023 12 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,942 $9,196 Not Implemented
IP0169 # 13 Y:2023 13 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,020 $7,379 Implemented
IP0169 # 14 Y:2023 14 2023 DISCONNECT BALLASTS $7 $20 Implemented
IP0169 # 15 Y:2023 15 2023 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $10,836 $47,613 Not Implemented
SD0623 # 01 Y:2023 01 2023 PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) $49,875 $0 Implemented
SD0623 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $43,378 $245,406 Not Implemented
SD0623 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,262 $500 Implemented
SD0623 # 04 Y:2023 04 2023 UPGRADE CONTROLS ON COMPRESSORS $2,157 $6,534 Not Implemented
SD0623 # 05 Y:2023 05 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,218 $7,000 Not Implemented
UD1049 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,825 $0 Implemented
UD1049 # 02 Y:2023 02 2023 CHECK FOR ACCURACY OF UTILITY / POWER METERS $9,224 $0 Not Implemented
UD1049 # 03 Y:2023 03 2023 REDUCE VENTILATION AIR $153,776 $45,000 Not Implemented
UD1049 # 04 Y:2023 04 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $72,916 $709 Not Implemented
UD1049 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,075 $952 Not Implemented
UD1049 # 06 Y:2023 06 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,943 $20,000 Not Implemented
UD1049 # 07 Y:2023 07 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $27,897 $0 Implemented
UD1049 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $115,254 $300,000 Implemented
UD1049 # 09 Y:2023 09 2023 INSTALL OCCUPANCY SENSORS $38,668 $14,325 Not Implemented
UD1049 # 10 Y:2023 10 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,436 $50 Not Implemented
UD1049 # 11 Y:2023 11 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $37,994 $22,360 Not Implemented
MZ0336 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $1,963 $2,020 Implemented
MZ0336 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,175 $53,900 Implemented
MZ0336 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $774 $0 Not Implemented