Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,208
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0738 # 01 Y:2015 | 01 | 2015 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $59,139 | $500 | Implemented |
MA0738 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,551 | $1,000 | Implemented |
MA0738 # 03 Y:2015 | 03 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,739 | $11,430 | Not Implemented |
MA0738 # 04 Y:2015 | 04 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,924 | $3,000 | Not Implemented |
MA0738 # 05 Y:2015 | 05 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,433 | $8,441 | Not Implemented |
MA0738 # 06 Y:2015 | 06 | 2015 | INSULATE BARE EQUIPMENT | $4,239 | $2,000 | Not Implemented |
MA0738 # 07 Y:2015 | 07 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $347 | $400 | Implemented |
UM0451 # 01 Y:2014 | 01 | 2014 | OPTIMIZE PLANT POWER FACTOR | $16,165 | $25,000 | Implemented |
UM0451 # 02 Y:2014 | 02 | 2014 | INSTALL OCCUPANCY SENSORS | $6,320 | $4,800 | Implemented |
UM0451 # 03 Y:2014 | 03 | 2014 | REVISE SMOKE CLEANUP FROM OPERATIONS | $79,670 | $60,000 | Not Implemented |
UM0451 # 04 Y:2014 | 04 | 2014 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,930 | $6,000 | Not Implemented |
AM0669 # 01 Y:2014 | 01 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $24,407 | $52 | Implemented |
AM0669 # 02 Y:2014 | 02 | 2014 | METER WASTE WATER | $20,590 | $4,500 | Implemented |
AM0669 # 03 Y:2014 | 03 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,410 | $0 | Implemented |
AM0669 # 04 Y:2014 | 04 | 2014 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $6,332 | $3,600 | Implemented |
AM0669 # 05 Y:2014 | 05 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,663 | $12,000 | Implemented |
AM0669 # 06 Y:2014 | 06 | 2014 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,800 | $315 | Not Implemented |
AM0669 # 07 Y:2014 | 07 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,186 | $570 | Implemented |
AM0669 # 08 Y:2014 | 08 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $950 | $44 | Implemented |
UA0130 # 01 Y:2014 | 01 | 2014 | USE RADIANT HEATER FOR SPOT HEATING | $15,715 | $35,154 | Not Implemented |
UA0130 # 02 Y:2014 | 02 | 2014 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $11,506 | $6,410 | Not Implemented |
UA0130 # 03 Y:2014 | 03 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $2,774 | $200 | Implemented |
UA0130 # 04 Y:2014 | 04 | 2014 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,266 | $0 | Implemented |
UA0130 # 05 Y:2014 | 05 | 2014 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $6,867 | $4,120 | Not Implemented |
UA0130 # 06 Y:2014 | 06 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,986 | $2,522 | Not Implemented |