IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0523 # 09 Y:2014 09 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,387 $20,000 Not Implemented
NC0523 # 10 Y:2014 10 2014 RECOVER WASTE HEAT FROM EQUIPMENT $14,411 $12,000 Not Implemented
NC0523 # 11 Y:2014 11 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,120 $1,000 Implemented
NC0523 # 12 Y:2014 12 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,179 $50 Implemented
NC0523 # 13 Y:2014 13 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,803 $1,935 Implemented
NC0523 # 14 Y:2014 14 2014 DEVELOP A REPAIR/REPLACE POLICY $2,088 $4,256 Not Implemented
OK0899 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,648 $3,905 Implemented
OK0899 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,062 $9,740 Implemented
OK0899 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $506 $594 Implemented
OK0899 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,496 $1,342 Implemented
OK0899 # 05 Y:2014 05 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,508 $140 Not Implemented
OK0899 # 06 Y:2014 06 2014 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $14,499 $12,962 Not Implemented
UD0913 # 01 Y:2014 01 2014 UPGRADE CONVEYORS $528 $255 Not Implemented
UD0913 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $615 $570 Implemented
UD0913 # 03 Y:2014 03 2014 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $511 $1,275 Implemented
UD0913 # 04 Y:2014 04 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,643 $8,500 Not Implemented
UD0913 # 05 Y:2014 05 2014 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $1,623 $7,000 Not Implemented
UD0913 # 06 Y:2014 06 2014 REPLACE BOILER $19,697 $163,500 Not Implemented
UD0913 # 07 Y:2014 07 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,485 $5,000 Not Implemented
UD0913 # 08 Y:2014 08 2014 COVER OPEN TANKS $3,270 $6,780 Implemented
UD0913 # 09 Y:2014 09 2014 INSTALL AUTOMATIC STACK DAMPER $2,665 $0 Implemented
UD0913 # 10 Y:2014 10 2014 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $414,555 $27,000 Not Implemented
UD0913 # 11 Y:2014 11 2014 USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS $27,921 $55,000 Not Implemented
UD0913 # 12 Y:2014 12 2014 TREAT AND REUSE RINSE WATERS $15,837 $10,000 Not Implemented
AM0667 # 01 Y:2014 01 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $8,900 $400 Implemented