IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0053 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $12,709 $1,150 Not Implemented
WM0053 # 05 Y:2014 05 2014 USE OPTIMUM THICKNESS INSULATION $147,137 $3,600 Not Implemented
WM0053 # 06 Y:2014 06 2014 OPTIMIZE PLANT POWER FACTOR $35,215 $60,300 Not Implemented
WM0053 # 07 Y:2014 07 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $29,006 $100,000 Not Implemented
WM0053 # 08 Y:2014 08 2014 USE SYNTHETIC LUBRICANT $11,107 $3,750 Not Implemented
WM0053 # 09 Y:2014 09 2014 IMPROVE SPACE COMFORT CONDITIONING $28,274 $1,139 Not Implemented
WM0053 # 10 Y:2014 10 2014 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,892 $0 Implemented
WM0053 # 11 Y:2014 11 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,232 $4,500 Not Implemented
WM0053 # 12 Y:2014 12 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,677 $19,918 Implemented
WM0053 # 13 Y:2014 13 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $560 $512 Implemented
LE0380 # 01 Y:2014 01 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,389 $780 Not Implemented
LE0380 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,774 $800 Not Implemented
LE0380 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $593 $520 Not Implemented
LE0380 # 04 Y:2014 04 2014 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,824 $2,960 Not Implemented
LE0380 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $938 $1,936 Not Implemented
LE0380 # 06 Y:2014 06 2014 USE RADIANT HEATER FOR SPOT HEATING $22,320 $54,000 Not Implemented
LE0380 # 07 Y:2014 07 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,916 $5,000 Not Implemented
LE0380 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,740 $4,950 Not Implemented
LE0380 # 09 Y:2014 09 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $607 $2,000 Not Implemented
SD0488 # 01 Y:2014 01 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,838 $7,262 Not Implemented
SD0488 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,362 $2,700 Implemented
SD0488 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,081 $14,125 Not Implemented
SD0488 # 04 Y:2014 04 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,681 $6,350 Implemented
SD0488 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,278 $3,660 Not Implemented
SD0488 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,195 $3,145 Not Implemented