IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,750

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0152 # 09 Y:2008 09 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $270 $0 Not Implemented
IC0148 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $261 $300 Implemented
IC0148 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $156 $102 Implemented
IC0148 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $1,624 $2,693 Implemented
IC0148 # 04 Y:2008 04 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $476 $1,278 Implemented
IC0148 # 05 Y:2008 05 2008 USE POWER DURING OFF-PEAK PERIODS $55 $0 Implemented
IC0148 # 06 Y:2008 06 2008 INSULATE BARE EQUIPMENT $1,124 $913 Implemented
IC0148 # 07 Y:2008 07 2008 BURN WASTE OIL FOR HEAT $4,155 $0 Implemented
IC0148 # 08 Y:2008 08 2008 TREAT AND REUSE RINSE WATERS $21,012 $27,696 Not Implemented
BD0348 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,613 $24,066 Not Implemented
BD0348 # 02 Y:2008 02 2008 INSTALL OCCUPANCY SENSORS $1,392 $2,026 Not Implemented
BD0348 # 03 Y:2008 03 2008 RECOVER WASTE HEAT FROM EQUIPMENT $9,758 $2,001 Not Implemented
BD0348 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,081 $2 Not Implemented
BD0348 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $142,941 $1,401 Not Implemented
BD0348 # 06 Y:2008 06 2008 USE RADIANT HEATER FOR SPOT HEATING $7,689 $5,001 Not Implemented
BD0348 # 07 Y:2008 07 2008 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $50,882 $42,001 Not Implemented
BD0348 # 08 Y:2008 08 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,743 $7,844 Not Implemented
BD0348 # 09 Y:2008 09 2008 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $54,402 $12,001 Not Implemented
BD0348 # 10 Y:2008 10 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $31,164 $7,000 Not Implemented
IC0142 # 01 Y:2008 01 2008 INSTALL SPECTRAL REFLECTORS / DELAMP $1,099 $488 Implemented
IC0142 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,855 $9,432 Implemented
IC0142 # 03 Y:2008 03 2008 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $697 $90 Not Implemented
IC0142 # 04 Y:2008 04 2008 USE RADIANT HEATER FOR SPOT HEATING $216 $620 Not Implemented
IC0142 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,469 $1,150 Implemented
IC0142 # 06 Y:2008 06 2008 ELIMINATE COMBUSTIBLE GAS IN FLUE GAS $2,442 $0 Implemented