IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

625

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0057 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,389 $6,391 Not Implemented
IC0057 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,069 $2,300 Implemented
IC0057 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $14,213 $127,200 Not Implemented
IC0057 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,675 $43,955 Not Implemented
SU0160 # 01 Y:2003 01 2003 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $446,941 $142,000 Not Implemented
SU0160 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $158,477 $3,600 Not Implemented
SU0160 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,336,834 $875,536 Implemented
SU0160 # 04 Y:2003 04 2003 INSULATE BARE EQUIPMENT $16,605 $34,047 Not Implemented
SU0160 # 05 Y:2003 05 2003 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $8,492 $4,200 Not Implemented
SU0160 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,587 $0 Not Implemented
SU0160 # 07 Y:2003 07 2003 INSULATE BARE EQUIPMENT $6,473 $6,375 Not Implemented
SU0160 # 08 Y:2003 08 2003 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $4,145 $12,781 Not Implemented
SU0160 # 09 Y:2003 09 2003 INSULATE BARE EQUIPMENT $1,997 $3,315 Not Implemented
WI0441 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $168 $640 Not Implemented
WI0441 # 04 Y:2003 04 2003 USE POWER DURING OFF-PEAK PERIODS $1,486 $0 Not Implemented
WI0441 # 03 Y:2003 03 2003 REPLACE CLOTH RAGS WITH PAPER TOWELS $2,550 $0 Implemented
WI0441 # 02 Y:2003 02 2003 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $5,650 $16,800 Implemented
WI0441 # 01 Y:2003 01 2003 INCREASE USE OF AUTOMATION $66,563 $30,000 Not Implemented
NC0255 # 01 Y:2003 01 2003 $300,000 $150,000 Not Implemented
NC0255 # 02 Y:2003 02 2003 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,060 $7,000 Not Implemented
NC0255 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $4,159 $5,600 Not Implemented
NC0255 # 04 Y:2003 04 2003 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $3,602 $500 Not Implemented
NC0255 # 05 Y:2003 05 2003 REPAIR AND ELIMINATE STEAM LEAKS $2,425 $350 Implemented
NC0255 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $213 $240 Implemented
NC0255 # 07 Y:2003 07 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $668 $120 Not Implemented