IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

595

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0280 # 02 Y:1996 02 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,794 $0 Implemented
WI0280 # 03 Y:1996 03 1996 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $1,714 $500 Not Implemented
WI0280 # 04 Y:1996 04 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,440 $0 Not Implemented
WI0280 # 05 Y:1996 05 1996 INSTALL TIMERS AND/OR THERMOSTATS $1,204 $800 Not Implemented
WI0280 # 06 Y:1996 06 1996 RECOVER WASTE HEAT FROM EQUIPMENT $1,165 $2,000 Implemented
WI0280 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $927 $640 Implemented
WI0280 # 08 Y:1996 08 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $917 $3,040 Not Implemented
WI0280 # 09 Y:1996 09 1996 INSTALL AUTOMATIC STACK DAMPER $701 $1,300 Implemented
WI0280 # 10 Y:1996 10 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $275 $246 Implemented
WI0269 # 01 Y:1996 01 1996 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $128,670 $10,000 Implemented
WI0269 # 02 Y:1996 02 1996 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $22,707 $0 Not Implemented
WI0269 # 03 Y:1996 03 1996 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $16,770 $25,000 Not Implemented
WI0269 # 04 Y:1996 04 1996 DISTILL CONTAMINATED SOLVENTS FOR REUSE $14,920 $22,000 Implemented
WI0269 # 05 Y:1996 05 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,044 $17,980 Implemented
WI0269 # 06 Y:1996 06 1996 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $4,367 $0 Not Implemented
WI0269 # 07 Y:1996 07 1996 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,269 $0 Implemented
WI0269 # 08 Y:1996 08 1996 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,458 $7,500 Not Implemented
WI0269 # 09 Y:1996 09 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,973 $6,000 Not Implemented
WI0269 # 10 Y:1996 10 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,653 $180 Implemented
WI0269 # 11 Y:1996 11 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,692 $825 Implemented
WI0269 # 12 Y:1996 12 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,014 $2,526 Not Implemented
WI0269 # 13 Y:1996 13 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $968 $0 Not Implemented
WI0269 # 14 Y:1996 14 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $525 $0 Not Implemented
WI0258 # 01 Y:1996 01 1996 INSTALL TIMERS AND/OR THERMOSTATS $9,926 $4,400 Implemented
WI0258 # 02 Y:1996 02 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,406 $50,000 Not Implemented