IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

853

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0434 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,482 $1,440 Not Implemented
OK0434 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,859 $888 Not Implemented
OK0434 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,960 $10,233 Not Implemented
OK0434 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,881 $0 Not Implemented
OK0407 # 01 Y:1993 01 1993 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $23,207 $118,871 Not Implemented
OK0407 # 02 Y:1993 02 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,004 $0 Implemented
OK0407 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,186 $360 Not Implemented
OK0407 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,059 $0 Implemented
OK0407 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $971 $903 Implemented
OK0407 # 06 Y:1993 06 1993 INSTALL SET-BACK TIMERS $725 $750 Implemented
OK0389 # 01 Y:1992 01 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,084 $200 Implemented
OK0389 # 02 Y:1992 02 1992 KEEP LAMPS AND REFLECTORS CLEAN $2,686 $6,210 Not Implemented
OK0389 # 03 Y:1992 03 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,437 $1,350 Implemented
OK0389 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $941 $1,348 Implemented
OK0389 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $262 $1,385 Implemented
OK0389 # 06 Y:1992 06 1992 INSTALL TIMERS AND/OR THERMOSTATS $371 $203 Not Implemented
OK0389 # 07 Y:1992 07 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $201 $683 Not Implemented
OK0389 # 08 Y:1992 08 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $264 $147 Not Implemented
OK0381 # 01 Y:1992 01 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,587 $150 Implemented
OK0381 # 02 Y:1992 02 1992 INSULATE BARE EQUIPMENT $374 $1,389 Implemented
OK0381 # 03 Y:1992 03 1992 RECOVER WASTE HEAT FROM EQUIPMENT $11,360 $1,185 Implemented
OK0381 # 04 Y:1992 04 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,183 $26,505 Not Implemented
OK0381 # 05 Y:1992 05 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,694 $0 Not Implemented
OK0379 # 01 Y:1992 01 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $854 $0 Implemented
OK0379 # 02 Y:1992 02 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,182 $200 Implemented