IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

850

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0261 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,946 $3,870 Implemented
WV0261 # 09 Y:2003 09 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $17,176 $375 Implemented
WV0261 # 10 Y:2003 10 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,291 $600 Implemented
WV0261 # 11 Y:2003 11 2003 BURN WASTE OIL FOR HEAT $2,391 $3,700 Not Implemented
LE0141 # 01 Y:2002 01 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,396 $1,000 Not Implemented
LE0141 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,018 $0 Implemented
LE0141 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,005 $100 Implemented
LE0141 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,139 $882 Implemented
LE0141 # 05 Y:2002 05 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,495 $7,000 Not Implemented
LE0141 # 06 Y:2002 06 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,311 $2,000 Not Implemented
LE0141 # 07 Y:2002 07 2002 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $36,900 $30,000 Not Implemented
LE0130 # 01 Y:2002 01 2002 INSTALL OCCUPANCY SENSORS $5,934 $150 Not Implemented
LE0130 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $583 $180 Not Implemented
LE0130 # 03 Y:2002 03 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,040 $0 Implemented
LE0130 # 04 Y:2002 04 2002 IMPROVE COMBUSTION CONTROL CAPABILITY $8,789 $1,000 Implemented
LE0130 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,677 $0 Implemented
LE0130 # 06 Y:2002 06 2002 IMPROVE LUBRICATION PRACTICES $7,373 $400 Not Implemented
LE0130 # 07 Y:2002 07 2002 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $105,753 $60,000 Not Implemented
WV0230 # 01 Y:2002 01 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,157 $1,150 Implemented
WV0230 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,458 $60 Implemented
WV0230 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $4,650 $6,000 Not Implemented
WV0230 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,594 $180 Not Implemented
WV0230 # 05 Y:2002 05 2002 RECOVER WASTE HEAT FROM EQUIPMENT $1,871 $620 Not Implemented
WV0230 # 06 Y:2002 06 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,675 $2,700 Not Implemented
WV0230 # 07 Y:2002 07 2002 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,097 $800 Implemented