IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

883

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0052 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,623 $19,409 Implemented
AR0052 # 05 Y:1995 05 1995 OPTIMIZE PLANT POWER FACTOR $15,249 $8,760 Implemented
AR0052 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $6,452 $770 Not Implemented
AR0052 # 07 Y:1995 07 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,786 $1,500 Not Implemented
AR0052 # 08 Y:1995 08 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,774 $8,835 Implemented
TN0549 # 01 Y:1995 01 1995 INSTALL TIMERS AND/OR THERMOSTATS $890 $1,520 Implemented
TN0549 # 02 Y:1995 02 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,249 $4,640 Not Implemented
TN0549 # 03 Y:1995 03 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,374 $770 Not Implemented
UF0120 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,595 $54,918 Implemented
UF0120 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $730 $4,270 Implemented
UF0120 # 03 Y:1995 03 1995 REPLACE ELECTRIC REHEAT WITH HEAT PIPES $2,103 $3,500 Not Implemented
UF0120 # 04 Y:1995 04 1995 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,769 $520 Not Implemented
UF0120 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,217 $850 Implemented
UF0120 # 06 Y:1995 06 1995 INSTALL COMMON HEADER ON COMPRESSORS $3,282 $2,500 Not Implemented
UF0120 # 07 Y:1995 07 1995 RECOVER WASTE HEAT FROM EQUIPMENT $2,241 $5,000 Not Implemented
ME0162 # 01 Y:1995 01 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,677 $4,000 Not Implemented
ME0162 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,843 $9,938 Implemented
ME0162 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $790 $870 Not Implemented
ME0162 # 04 Y:1995 04 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $477 $400 Implemented
ME0162 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $366 $300 Implemented
SD0121 # 01 Y:1995 01 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,420 $7,500 Implemented
SD0121 # 02 Y:1995 02 1995 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $3,648 $977 Implemented
SD0121 # 03 Y:1995 03 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $656 $702 Implemented
SD0121 # 04 Y:1995 04 1995 REDUCE EXCESSIVE BOILER BLOWDOWN $664 $15 Implemented
SD0121 # 05 Y:1995 05 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,118 $1,583 Implemented