Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
935
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ND0318 # 13 Y:1999 | 13 | 1999 | DISCONNECT BALLASTS | $115 | $230 | Not Implemented |
UM0120 # 01 Y:1998 | 01 | 1998 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,335 | $250 | Not Implemented |
UM0120 # 02 Y:1998 | 02 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,860 | $1,000 | Implemented |
UM0120 # 03 Y:1998 | 03 | 1998 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,029 | $1,000 | Implemented |
UM0120 # 04 Y:1998 | 04 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,783 | $100 | Implemented |
UM0120 # 05 Y:1998 | 05 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $962 | $1,500 | Not Implemented |
UM0120 # 06 Y:1998 | 06 | 1998 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $14,994 | $5,000 | Not Implemented |
UM0120 # 07 Y:1998 | 07 | 1998 | IMPROVE SPACE COMFORT CONDITIONING | $1,440 | $518 | Implemented |
UM0121 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,850 | $2,048 | Implemented |
UM0121 # 02 Y:1998 | 02 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $511 | $1,000 | Implemented |
UM0121 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $761 | $990 | Implemented |
UM0121 # 04 Y:1998 | 04 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $12,085 | $6,000 | Implemented |
UM0121 # 05 Y:1998 | 05 | 1998 | USE EVAPORATION TO CONCENTRATE MATERIAL | $8,359 | $12,000 | Implemented |
UM0121 # 06 Y:1998 | 06 | 1998 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $12,017 | $11,000 | Not Implemented |
UM0121 # 07 Y:1998 | 07 | 1998 | $1,756 | $3,350 | Implemented | |
UM0119 # 01 Y:1998 | 01 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,067 | $11,283 | Implemented |
UM0119 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,659 | $30,946 | Not Implemented |
UM0119 # 03 Y:1998 | 03 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,816 | $1,800 | Not Implemented |
UM0119 # 04 Y:1998 | 04 | 1998 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $24,125 | $3,800 | Not Implemented |
UM0119 # 05 Y:1998 | 05 | 1998 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $200 | $132 | Not Implemented |
UM0119 # 06 Y:1998 | 06 | 1998 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $2,707 | $11,000 | Not Implemented |
UM0119 # 07 Y:1998 | 07 | 1998 | EXPAND OPERATIONS INTO UNUSED SPACE | $319,544 | $0 | Not Implemented |
UM0117 # 01 Y:1998 | 01 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $558 | $918 | Implemented |
UM0117 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,896 | $9,124 | Implemented |
UM0117 # 03 Y:1998 | 03 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $724 | $1,000 | Implemented |