IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

746

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0002 # 02 Y:2001 02 2001 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,612 $-8,612 Implemented
TA0002 # 03 Y:2001 03 2001 $2,563 $0 Implemented
TA0002 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,094 $0 Implemented
TA0002 # 05 Y:2001 05 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $432 $454 Not Implemented
TA0002 # 06 Y:2001 06 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $225 $90 Implemented
MA0483 # 01 Y:2001 01 2001 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $8,700 $0 Implemented
MA0483 # 02 Y:2001 02 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,400 $14,000 Not Implemented
MA0483 # 03 Y:2001 03 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,200 $11,000 Not Implemented
MA0483 # 04 Y:2001 04 2001 INSULATE BARE EQUIPMENT $2,250 $12,000 Not Implemented
MA0483 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,650 $800 Implemented
MA0483 # 06 Y:2001 06 2001 USE RADIANT HEATER FOR SPOT HEATING $1,050 $6,000 Not Implemented
MA0483 # 07 Y:2001 07 2001 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $570 $2,500 Implemented
SF0213 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,492 $0 Implemented
SF0213 # 02 Y:2001 02 2001 INSULATE BARE EQUIPMENT $19,198 $3,152 Not Implemented
SF0213 # 03 Y:2001 03 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,282 $950 Not Implemented
SF0213 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $106 $120 Implemented
SF0213 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $312 $1,113 Implemented
SF0213 # 06 Y:2001 06 2001 RECOVER WASTE HEAT FROM EQUIPMENT $13,159 $55,000 Not Implemented
SF0213 # 07 Y:2001 07 2001 RECOVER AND REUSE WASTE MATERIAL $105,153 $107,153 Not Implemented
UD0613 # 01 Y:2001 01 2001 REPLACE TREATED WATER WITH WELL / SURFACE WATER $21,501 $15,000 Not Implemented
UD0613 # 02 Y:2001 02 2001 $15,606 $14,000 Implemented
UD0613 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,566 $0 Implemented
UD0613 # 04 Y:2001 04 2001 USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) $5,513 $5,000 Implemented
UD0613 # 05 Y:2001 05 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,342 $0 Implemented
LE0101 # 01 Y:2001 01 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $9,696 $500 Implemented